background image

 

 3

TRUNKGUARD™ 

Series Fieldbus Device Couplers

(Zone 1 Locations)

TG300

Introduction

Device Couplers provide easy and practical 
mechanisms for implementing fieldbus systems.  
TRUNKGUARD Series 300 Device Couplers (TG300) 
simplify the use of fieldbus devices in Zone 1 by 
allowing “live” access for maintenance and eliminating 
the need for Exd junction boxes.  

The TG300 Series offers our patented Automatic 
Segment Termination feature and a key-operated 
magnetic interlock which permits one spur at a time to 
be de-energized and worked on without shutting down 
the entire segment.  

TRUNKGUARD Device Couplers provide electronic 

and fully auto-resetting spur short-circuit protection 

that prevents a segment failure that maybe caused by 

a short circuit to any field device.  Utilizing a unique 

“Fold-Back” technique, any spur that attempts to draw 

more than 48mA is automatically switched off and not 

permitted any current flow until the fault is removed.  

With removal of the spur short circuit, TRUNKGUARD 

automatically reconnects the spur to the fieldbus 
segment within 20 microseconds.  

The Automatic Segment Termination feature 

eliminates segment failure from under or over 

termination which is generally the most common 

cause for delay in starting up fieldbus projects.  The 

auto-terminator also assures that local parts of a 

segment will continue to function even if there is a 
downstream cable break.

About this Manual

Wherever you see a “

Note

”, “

Caution

” or “

WARNING

” 

pay particular attention.

WARNING

 - Hazardous procedure or condition that 

could injure the operator.

Caution

 - Hazardous procedure or condition that could 

damage or destroy the unit.

Note

 - Information that is helpful for a procedure, 

condition, or operation of the unit.

DIN Units

TG300-DIN units are designed to fit onto a 32mm 
(EN50035) G-type and 35mm (EN50022) Top Hat 
DIN-rail and may be mounted at any angle and in 
such a way as to allow easy access to terminal 
receptacles and to keep LEDs visible.  These units are 
not weatherproof and outdoor placement will require 
an external enclosure.  Any enclosure which meets 
the requirements of the location in relation to electrical 
and mechanical safety may be used.

For Zone 1 applications an external enclosure is 
required.  The enclosure and glands must be certified 
for increased safety and suitable for Zone 1 use, 
IP64 protection minimum.  All MooreHawke TG300 
enclosures are suitable for Zone 1.

Device Coupler Enclosures 

Standard enclosures are available in GRP (Glass 

Reinforced Polyester with side-entry cable glands).  

These enclosures provide IP66/NEMA Type 4X 
protection.

Standard cable glands are nickel-plated brass, and 
can be ordered for use with un-armored or armored 
cable. Compound seal glands (for cable with inter-core 
spaces, i.e., unfilled cable), and quick connect plugs 
and sockets are also available.  Field devices are 
individually connected directly to terminals via spur 
cables through a variety of cable gland options.

Installation

The enclosure should be mounted to a flat surface 
using the internal mounting holes or via external 

Содержание Hawke TRUNKGUARD Series

Страница 1: ...TG300 TG300 May 2016 920091D TRUNKGUARD Series Fieldbus Device Couplers Zone 1 Locations TRUNKGUARD Series Fieldbus Device Couplers Zone 1 Locations...

Страница 2: ...oupler Enclosures 3 Specifications 4 Dimensions 4 Installation 6 Wiring Connections 6 Device Coupler Hook Up 6 DISCONN Key 7 Recommended Ground Wiring Practices 7 CE Conformity 8 Testing and Troublesh...

Страница 3: ...you see a Note Caution or WARNING pay particular attention WARNING Hazardous procedure or condition that could injure the operator Caution Hazardous procedure or condition that could damage or destro...

Страница 4: ...Internal Automatic Segment Termination is standard For manual Communications Performance termination specify the MT option with the MooreHawke model number e g TG308 DIN MT Also separately specify a T...

Страница 5: ...Enclosure Installation Dimensions 8 Spur Model 4 Spur Model OUT IN 1 2 3 4 250mm 9 85 in 200mm 7 87 in 120mm 4 72 in 255mm 10 04 in 235mm 9 25 in OUT IN 1 2 3 4 5 6 7 8 255mm 10 04 in 235mm 9 25 in 25...

Страница 6: ...e of installation Cables should be brought to the device coupler in such a way as to prevent external water from running into the cable entry position For cables coming vertically down to a device cou...

Страница 7: ...ded to an external earth stud DISCONN Key The DISCONN Key contains the magnet used to operate the magnetic interlock which permits individual fieldbus devices to be de energized and worked on without...

Страница 8: ...a core to shield fault on that spur cable Locate and repair any spur fault before reconnecting that spur All LEDs are OFF Any red LED is ON Table 1 LED Indications Testing and Troubleshooting Testing...

Страница 9: ...Customer Support If service assistance is ever required for an instrument in your application refer to the back cover of this manual for the telephone numbers to MooreHawke Customer Service Department...

Страница 10: ......

Страница 11: ...IES FOR BREACH OF ANY WARRANTY CONCERNING THE GOODS OR SERVICES SHALL BE FOR THE COMPANY AT ITS OPTION TO REPAIR OR REPLACE THE GOODS OR SERVICES OR REFUND THE PURCHASE PRICE THE COMPANY SHALL IN NO E...

Отзывы: