background image

 

The Interface Solution Experts 

17

 CPT

PC-Programmable Signal

Isolater/Converter

Customer Support

Moore Industries is recognized as the industry leader 
in delivering top quality to its customers in products 
and services.  We perform a battery of stringent quality 
assurance checks on every unit we ship.  If any Moore 
Industries product fails to perform up to rated speci-
fi cations, call us for help.  Our highly skilled staff of 
trained technicians and engineers pride themselves on 
their ability to provide timely, accurate, and practical 
answers to your process instrumentation questions.

Factory phone numbers are listed on the back cover of 
this manual.

If problems involve a particular CPT, there are several 
pieces of information that can be gathered  before 
you call the factory
 that will help our staff get the an-
swers you need in the shortest time possible.  For 
the fastest service, gather the complete model and 
serial number(s) of the problem unit(s) and the job 
number of the original sale.

Installation

Installation consists of physically mounting the unit 
and completing the electrical connections.

Mounting  the  CPT 

The CPT can be mounted on standard DIN mounting 
rails.  

Making  the  Electrical  Connections

Please refer to Figure 3 for electrical connections. 

Recommended  Ground  Wiring 
Practices

Moore Industries recommends the following ground 
wiring practices:

•  Any Moore Industries product in a metal case or 

housing should be grounded.

•  The protective earth conductor must be connected 

to a system safety earth ground before making any 
other connections.

•  All input signals to, and output signals from, Moore 

Industries’ products should be wired using a 
shielded, twisted pair technique.  Shields are to be 
connected to an earth or safety ground at the unit 
itself.

•  The maximum length of unshielded input 

and/or output signal wiring should be 
two inches.

CE Conformity

Installation of any Moore Industries’ products that 
carry the CE certifi cation must adhere to the 
guidelines above in order to meet the requirements set 
forth in the European EMC and Low Voltage Directives 
(EN 61326 and EN 61010).  Consult the factory for the 
most current information on products that have been 
CE certifi ed. 

Operation

Once programmed, calibrated, installed, and supplied 
with the correct power, the CPT transmitter begins to 
operate immediately.  Depending upon environmental 
conditions, it can be expected to operate unattended 
for extended periods of time.

Maintenance

Moore Industries suggests a check for terminal 
tightness and general unit condition every 6-8 
months.  Always adhere to any site requirements for 
programmed maintenance.

Содержание CPT HLPRG

Страница 1: ...CPTMay 2016 225 708 00 D PC Programmable Signal Isolater Converter All product names are registered trademarks of their respective companies CPT HLPRG PC Programmable Signal Isolater Converter...

Страница 2: ...s 6 Configuring the CPT 7 Installing the Configuration Software 8 Connecting the CPT to the PC 8 PC Configuration Software Summary 9 Configuration 10 Output Level if Failure 10 Broken Wire Test Overri...

Страница 3: ...Custom Table 16 Installation 17 Mounting the CPT 17 Making the Electrical Connections 17 Recommended Ground Wiring Practices 17 CE Conformity 17 Operation 17 Maintenance 17...

Страница 4: ...figuration The output may also be configured to narrower spans from the PC Configuration Program TX Power A transmitter excitation power supply is standard on the CPT HLPRG You may access this at the...

Страница 5: ...cal 3W max Power Supply Effect 0 002 of span per 1 of line change Input Impedance 20ohms for current inputs 1 1Mohm for voltage inputs Input Over Range Protection 100mA for current inputs 30Vdc for vo...

Страница 6: ...KEY AC DC Power Input ACC DCC Power Input CM Relay Common COM Analog Common GND Ground NOTES 1 Terminal blocks can accomodate 14 22 AWG solid wiring 2 NO CM NC labeling is present only when the unit i...

Страница 7: ...igent PC Configuration software The software settings are downloaded to the transmit ter in the form of a Configuration File and stored in the instruments memory You can save a backup copy of the file...

Страница 8: ...mitter and most parameters can be set without benefit of input from a CPT This makes it easy to create a set of operating parameters save them to disk and download them to one or more transmitters at...

Страница 9: ...ou may enable Start Measurements and Stop Measurements upload your configuration to PC or download your configuration to the unit save your configuration to a file and print out your configuration set...

Страница 10: ...3 6mA upscale for voltage outputs limits are 0 5V downscale and 11 0V upscale When a failure is detected the Fail Last feature if enabled holds the last measured value before the failure occurred If t...

Страница 11: ...re energized whenever the process input is in an alarm condition These relays de energize when the process input returns to the reset point including any deadband Band Alarm The Band Alarm incorporate...

Страница 12: ...verifies that the input from the sensor to the alarm is being interpreted correctly The CPT can trim any point along the scale Note that one point trimming applies an offset to the sensor reading whi...

Страница 13: ...grammable Signal Isolater Converter Figure 7 Trimming the CPT HLPRG MULTIMETER OR DCS NO INPUT READY ALARM COM COMPUTER PROGRAMMABLE TRANSMITTER VOLTAGE SOURCE _ CURRENT SOURCE _ _ AC OR DC POWER SUPP...

Страница 14: ...es stored click the Output Trim ON 5 Set Status back to Measurements On If selected the User trim values will be used and the manufacturer settings will be nullified Loop Test A Loop Test may be perfo...

Страница 15: ...he software 3 Insert a value between 5 and 120sec in the Damping Sec field This is the amount of time it will take for the output to reach 63 of the step output change once the input exceeds the value...

Страница 16: ...nts you are to set and insert this value into the Number Of Points line hit Enter This will highlight the number of points you have selected Note To clear the table and start over at any time click Cl...

Страница 17: ...ons Please refer to Figure 3 for electrical connections Recommended Ground Wiring Practices Moore Industries recommends the following ground wiring practices Any Moore Industries product in a metal ca...

Страница 18: ...nt packing material and carefully pack the equipment in a sturdy shipping contain er 5 Ship the equipment to the Customer Service Department nearest you The returned equipment will be inspected and te...

Отзывы: