background image

13

Installation

XG0146 - 180405

Figure 7. 

 Installing a MTO4-F termination.

Figure 7.b 

 Installing a PTO termination with the MSR frame.

Figure 7.c 

 Installing a MTO termination with the BSR frame.

Figure 7.d 

 Installing a MTO termination with MOSR frame.

Figure 7.e 

 Installing the VSS Vinyl Shield.

Figure 7.f 

 Installing a MTO termination heat guard.

1

12”

2”

12”

12”

This section applies to installations where the direct vent termination 

will be wall mounted. 

NOTE:

 If subject to a highly corrosive environment 

i.e. Seaside, Montigo recommends using Stainless Steel Termination.

Section 3-3: Installing a Wall Mounted Termination 4''/7''

Installation of termination with built in frame

A termination with a built-in frame is installed during framing of a 

structure.
1. Frame the termination opening to 11" x 11".
2. Install exterior sheathing to the structure framing.
3. Fasten the termination to the sheathing using a minimum of 4 screws.

MSR Frame

MTO-4 (4"/7")

Termination

MTO-4F (4"/7")

Termination

Installation of a termination shield for vinyl siding

The VSS Termination shield is installed when the exterior of a structure 

is clad with Vinyl siding. It is placed directly above, and on-center with 

the termination. 

Installation of termination frame at time of framing

Terminations with a MSR frame allow the installation of the frame prior 

to installation of the termination.
1.  Frame the termination opening to 12" x 12".
2.  Secure the MSR Frame to the exterior sheathing of the structure.
3.  Fasten the termination to the MSR Frame using a minimum of 4 screws.

1. Frame the MOSR opening to 12" x 12".
2. Fasten the MOSR frame to the interior side of the studs, concrete, 

or finished wall construction using a minimum of 4 screws.

3. Insert the termination into the MOSR frame as shown here, (from 

the inside) and attach to the MOSR by installing a min. quantity of 4 

bolts into the threaded nuts on the MOSR Frame.

Installation of termination frame at time of framing in masonry

Terminations with a BSR frame allow the installation of the frame in 

masonry prior to the installation of the termination
1.  Frame the BSR opening to 12" x 12".
2.  Secure the BSR Frame to the exterior sheathing of the structure.
3.  Fasten the termination to the BSR Frame using a minimum of 4 screws.

BSR Frame

MTKOG 

4"/7")

Installing heat guards 

Installing heat guards over terminations is recommended in installations 

where the termination is located within 7' feet above grade, or above 

a pedestrian walkway, and may be required by code in public areas.

1. Ensure that the two long mounting brackets are facing the bottom 

of the termination (See inset). This will provide more heat protection 

at the top of the termination, where temperatures are highest.

2. Attach to the faceplate of the termination using four sheet metal 

screws.

11”

11”

Framing

Exterior 

Sheathing

Fastening Hard-

ware, minimum 

4-screws

Framing

Exterior 

Sheathing

Fastening Hardware, 

minimum 4-screws

MTO-4 (4"/7")

Termination

Framing

Exterior 

Sheathing

Fastening Hardware, 

minimum 4-screws

Exterior Vinyl 

siding

MTO-4 (4"/7")

Termination

VSS Vinyl shield

Installation of termination from inside structure

A Termination with a MOSR Frame is installed from the inside of the 

structure. These are commonly used in high-rise construction.

MOSR Frame

MTO-4 (4"/7")

Termination

12”

12”

Fastening Hardware, 

minimum 4-screws

Framing, 

concrete 

or other 

materials

Exterior 

Sheathing, concrete 

or other materials

Содержание H34DF

Страница 1: ...tural Gas or Propane Gas HLB34 18 000 BTU hr Natural Gas or Propane Gas HLB34 2 18 000 BTU hr Natural Gas or Propane Gas Read and understand this manual Improper installation adjustment alteration ser...

Страница 2: ...ion See Appendix B The Montigo warranty will be voided by and Montigo disclaims any responsibility for the following actions Modification of the fireplace and or components including Direct Vent assem...

Страница 3: ...3 Fireplace Facing 23 Finishing around the fireplace 23 Flush Finishing the Fireplace 23 Section 7 Screen Installation and Removal 24 Removing the Screen 24 To Install Screens 24 Replacement Screens 2...

Страница 4: ...tricalinstallations mustconformtothelocalcodesor intheabsenceoflocalcodes to the current version of Canadian Electrical Code CSA C22 1 1 Installations in the USA must conform to the local codes or in...

Страница 5: ...tops installed Exteriorwall roofflashinginstalledandsealedincompliancewithlocalbuildingcode Terminations installed and sealed in compliance with local building code Direct vent termination is highest...

Страница 6: ...6 180405 Rating Plate Sample Figure 1 1 Rating Plate for standing pilot SIT Figure 1 2 Rating Plate for IPI electronic ignition LBL1205 V6 2 Stand Pilot Screen AUG 17 2015 LB1223 V5 2 SIT IPI with scr...

Страница 7: ...affic has adequate ventilation and offers an accessible path for Direct Vent installation 898 35 3 8 134 5 1 4 578 22 3 4 140 5 1 2 797 31 3 8 653 25 11 16 489 19 1 4 838 33 86 3 3 8 203 8 POWER SUPPL...

Страница 8: ...ons Shelves over the fireplace Alcove above the fireplace Shelves over the fireplace Top vent Figure 3 b Combustible Framing for shelves over the fireplace Rear vent Figure 3 d Combustible Framing for...

Страница 9: ...ions the minimum clearance is 2 from the rear of the fireplace to a wall or any combustible materials and 17 to the underside of any combustible shelf materials Figure 4 For Top or Rear Vent applicati...

Страница 10: ...nation location is acceptable Once the termination location has been established refer to the appropriate section below for installation details All fireplaces shipped from the factory are top vent Si...

Страница 11: ...led diagram of allowed termination locations see Appendix A A maximum of two offsets each offset is made up of 2 90 bends may be made for vertical vent runs Firestops must be installed as required by...

Страница 12: ...upport plate 32 max Termination 12 Max PVTK1 PEXT Sections Figure 6 d Rear vent roof mounted venting 1 90 bend Storm collar Support plate 32 max Roof flashing MVTK1 Termination Support ring MEXT Secti...

Страница 13: ...the interior side of the studs concrete or finished wall construction using a minimum of 4 screws 3 Insert the termination into the MOSR frame as shown here from the inside and attach to the MOSR by i...

Страница 14: ...ed area the installation is acceptable Wall mounted Terminations ThefollowingdetailsaresomepossibleconfigurationsforWallmounted terminations See below Heat Shield Termination Hearth Exterior Wall 39 M...

Страница 15: ...the Venting Graph with an X If the X falls on or above the top boundary of the shaded area the installation is acceptable VENT RUN Figure 9 H 34DF Rear Vent Venting Graph for wall mounted terminations...

Страница 16: ...onandanMFL 1orMFL 2 12 or24 compressed length andaframe ifappropriate Flexmaybeturnedtoobtaindesired degree of angle required but must not exceed 45 NOTE Through the wall venting kits are also availab...

Страница 17: ...of rigid pipe to maintain integrity of internal supports For flex venting place the springs supplied with the pipe kit between the outer and inner pipes to keep the pipes separate and avoid any possib...

Страница 18: ...f m Section MEXT 3 36 f m Section MEXT 4 48 f m Section MEXT 6 72 f m Section 46DVA 06 6 Section 46DVA 09 9 Section 46DVA 12 12 Section 46DVA 18 18 Section 46DVA 24 24 Section 46DVA 36 36 Section 46D...

Страница 19: ...e structure To complete the installation fasten the Heat Shield Outer Section Termination frame to the structure Figure 15 e RHS100 Installation Figure 15 c RHS100 Installation Install by sliding Oute...

Страница 20: ...ights ON OFF CONTROL MAIN Power 120VAC 60 Hz 6 Amps SPARK SENSOR RED BLACK BATTERY PACK MAIN ON OFF SWITCH YELLOW GREEN 5 PROFLAME PILOT B RNER ORANGE GREEN BLACK BROWN YELLOW ORANGE 6 10 6 B B Wht Wh...

Страница 21: ...cold start condensationwillnormallyformontheinnerglass surface of the door This condensation will quickly dry however the condensation tends to run down the glass and cause some streaking CPI mode he...

Страница 22: ...ction valve and valve train under normal operatingpressurewithacommerciallyavailableleakchecksolution DO NOT USE A FLAME OF ANY KIND TO TEST FOR LEAKS PRESSURE REQUIREMENTS Gas Pressure Natural Gas Pr...

Страница 23: ...D INTO A WALL Side wall clearances are 3 Combustible surrounds may be installed with 3 clearance to the side of the fireplace as shown Combustible Header Drywall Sheetrock 3 45 6 When covering the upp...

Страница 24: ...fireplace has been turned off Safety screens are mandatory while glass is hot and can reduce the risks of severe burns Please keep children away from the fireplace at all times CAUTION NOTICE Screen B...

Страница 25: ...or on either side usually midway and lift upward lift the door carefully up and away from the front of the fireplace Place the door aside in a safe place while maintenance and or cleaning is being per...

Страница 26: ...ontigo burners and accessories Never install or add any additional or alternative media rock wool or other material in this appliance The use of additional or alternative materials may pose potential...

Страница 27: ...satisfactory replace the glass door If the flame does not appear satisfactory double check the air inlet and exhaust outlet pipe to ensure that they are unobstructed STEP 7 Place the Embers as shown A...

Страница 28: ...P 3 Slide the rock guard locator tabs behind the Burner The rocks on the Rock Guard should line up between the air inlets of the burner STEP 4 Slide the rock guard locator tabs behind the Burner The r...

Страница 29: ...hree faux D ceramic Rocks between burner and front of firebox frame flat surfaces of rock against the front of door opening and bottom pan of the fireplace Note similar size of rock diameters Figure 2...

Страница 30: ...ux Rock on top behind the pilot burner faux Rocks Figure 23 t Place the seventh Top faux Rock in the front Figure 23 u Place the eight Top faux Rock in the front to the Right of the last Rock Figure 2...

Страница 31: ...unless knob is pushed in slightly Do not force Standing Continuous Pilot Ignition SIT NOVA 820 with American Flame Electronic Ignition For Your Safety READ BEFORE LIGHTING C Use only your hand to pus...

Страница 32: ...the Troubleshooting section Repeat step 5 9 If the system will not function correctly follow the instructions To Turn Off Gas To Appliance and call your service technician or gas supplier 1 STOP Read...

Страница 33: ...flame 2 Control Module 4 Wiring Harness 5 Variable Speed fans If applicable 7 Proflame 2 remote control 8 Battery Pack 9 Manual override switch NOTE Can not be used with home automation systems SW1 Pr...

Страница 34: ...r 4 times to indicate transmitter s command is accepted The System is now initialized Temperature Indication Display With the system in the Off position press the Thermostat Key and the Mode Key at th...

Страница 35: ...show that the room thermostat is On and the set temperature is now displayed To adjust the set temperature press the Up or Down Arrow Keys until the desired set temperature is displayed on the LCD sc...

Страница 36: ...to turn on off or adjust the fan speed A single beep will confirm reception of the command Disabling Thermostat Some jurisdictions and bedroom installations require the thermostat to be disabled 1 Pa...

Страница 37: ...ring the initial firing Silicone seals will off gas leaving a visual deposit of a white substance on combustion chamber walls This can easily be removed using normal household products Use a vacuum cl...

Страница 38: ...Pressure are within acceptable limits Pilot lights but Main burner will not Light and igniter continues to spark 1 Check the Pilot Flame Sensor Rod and clean with steel wool or similar 2 Check the Pi...

Страница 39: ...Pilot Tubing RPTA03 Door RDTH34 Replacement Screen RSCH34 Replacement Parts List SIT IPI Proflame 2 Part H34DF I HLB34DF I HLB34DF I 2 Log Set RLGSH34 N A N A NG Gas Valve hi low RGC3044 Propane Gas V...

Страница 40: ...bustion air inlet to other appliance for appliance 100 000 BTU H 30 KW 12 inches 12 inches M clearance to forced air supply inlet 6 feet 3 feet above air inlet N clearance above paved sidewalk or pave...

Страница 41: ...gas NG or liquefied petroleum LP only Burning conventional fireplace fuels such as wood coal or any other solid fuel will cause damage to the appliance produce excessive temperatures will result in a...

Страница 42: ...of The Companies The Companies shall in no event be responsible for any warranty work done without first obtaining the Companies written consent The Companies employees and dealers have no authority t...

Страница 43: ...he sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBSTRUCTIONS Appendix C Amendment Gas Fireplace Equipment sold in the State of Massach...

Страница 44: ...XG0146 180405 Installation Maintenance Manual H34DF HLB34DF HLB34DF 2 Single Sided Gas Fireplace...

Отзывы: