11
Installation
xg0227 - 112718
Clearances
Removing the nailing Flange Extension
Installing The Standoffs
MODEL
Top - Rear
vent
†
Top - Top
vent
†
Header
Sides
Front
Rear
Venting - Top
Venting -
Sides,
bottom
h*38PRc*I-2
11"
17½"
4"
0"
0"
1"
2"
1"
h*38PFc*I-2
11"
17½"
4"
0"
0"
2"
2"
1"
h*38c**I-2
13"
17½"
4"
5"
0"
2"
2"
1"
figure 4.
Combustible Wall Clearances
When installing a shelf over the top of the fireplaces, the following
guidelines must be adhered to:
For Rear Vent applications, the minimum clearance is 1" from the rear of
the fireplace to a wall, or any combustible materials, and 11" clearance
from the top of the fireplace to the underside of any combustible shelf
materials.
For top Vent applications, the minimum clearance is 1" from the rear
of the fireplace to a wall, or any combustible materials, and 17 1/2" to
the underside of any combustible shelf materials.
1” clearance is maintained on sides and bottom of vent runs and 2”
above horizontal vent runs to any combustible material.
† Note: Clearance from top of fireplace to a ceiling within the fireplace
enclosure.
** note: For mantel clearance, please refer to section 6: Finishing
The 4" nailing flange extension is shipped attached to the top edge of
the fireplace, see Figure 1.
The nailing flange extension may be substituted with a piece of
non-combustible material of the same thermal characteristics, ie:
cement board or equivalent to fit the opening. This is recommended
in applications where the facing materials will not adhere to the metal
nailing flange. To remove the Nailing Flange Extension follow the
directions below:
To avoid elevated mantel temperatures, all Divine gas fireplaces are
required to have the supplied standoffs installed. The fireplace is
supplied with two standoffs. Bend and install these standoffs on top
of the fireplace ensuring that the height of the standoff maintains a
8" clearance.
figure 4.b
Installing standoffs
STEP 1:
Remove screws from top of the unit
STEP 2:
Remove shell from the top of unit. Remove screws from
outer edge.
STEP 4:
Remove the nailing flange extension from the unit.
Reinstall shell. screw shell in place.
STEP 3:
Remove shell from the top of unit. Remove screws from
outer edge.
fasTen
sTandoffs
in guTTer
8"