
- 12 -
06 BRINGING INTO SERVICE
6.1 Anforderungen an das ausführende Personal
see chapter
1.8
Staff training
6.2 Mounting / Assembly
6.2.1 Requirements
- Dry and oil-free compressed air
- Clean and stable installation location
- Ensure ergonomic working height
- Room temperature: 15
– 30 °C
See also
6.3
measures to be taken before initial operation
Required space/ space requirements 1 x 1 x 2 m (LxWxD)
Install the machine on a safe (not loose) worktop and ensure that it is firmly fixed to the worktop.
6.2.2 First use
- Remove the unit from its packaging
- Open the protection door
- Remove the dosing jar
- Securely screw the unit to the worktop with the screw (1) (through the bottom of machine (2))
Содержание 4451
Страница 1: ......