Molnar SL02 Скачать руководство пользователя страница 2

                                                      Page 2 of 22 

           

    

Rev B 

 Dec 2009 

 
 
 
 

 
 
 
 
 
 
 

OPTIONAL 240 VOLT SINGLE PHASE 

 

MINIMUM REQUIREMENTS FOR ELECTRICAL CONNECTION 

OF MOLNAR HOISTS 

 

Important: All installations should be carried out by suitably  
qualified persons. Failure to comply may void warranty.  

 
The following information is a guide only based on the 
latest standards as set out in AS/NZS 3000, for installations 
outside of Australia & New Zealand refer to local 
standards regulations. 

 

Circuit Breakers should be of "D" curve type (motor start, 
high inrush current) - Ratings given as a maximum for 
circuit & motor protection based on DOL selection guide.  

 

Voltage operating range: -6% to + 10% of motor 
nameplate Voltage. 
Motor Voltage 240V Operation range 225V to 264V.  
 
Cable sizes are given as a guide only for a maximum 
cable length to 30m. Longest cable runs and in area 
where supply voltage is below motor voltage,  
Calculation should be made to ensure Voltage Drop will 
not fall below minimum operating voltage.

  

When installed motors must be tested under Full Load checking  

Voltage at motor terminals

 
  

Motor 2.2kW 240V Single-phase model CWC3640F  

Full Load Current  

 

12.4 Amps  

Min Cable Size  

 

2.5mm 2 core 

earth  

Circuit Breaker  

 

1 phase 32 Amp 10kA  
Recommended Clipsal4CB132/10 or equivalent  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание SL02

Страница 1: ...Page 1 of 22 Rev B Dec 2009 MOLNAR SCISSOR LIFT HOIST SL02 INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...gs given as a maximum for circuit motor protection based on DOL selection guide Voltage operating range 6 to 10 of motor nameplate Voltage Motor Voltage 240V Operation range 225V to 264V Cable sizes a...

Страница 3: ...de back cover must be signed by the installer The guarantee card must be completed and returned to MOLNAR ENGINEERING PTY LTD When installed in tropical environments it is advisable to raise the hoist...

Страница 4: ...Page 4 of 22 Rev B Dec 2009 Model SL02 Complies fully with the Australian Standard 1418 9 1996...

Страница 5: ...4mm Maximum raised height 1830mm Minimum lowered height platform 188mm Lifting time working height approx 55 secs Lowering time 3tonnes approx 30 secs Electric motor 3 phase 2 2kw 2700 rpm 415 volts 5...

Страница 6: ...ce SAFE AND EFFICIENT OPERATION Due to an electro hydraulic system which gives years of trouble free service Raising and lowering of vehicle is achieved through an electronic remote controller Sturdy...

Страница 7: ...suspension springs are relaxed facilitating service and repair work Some other uses are wheel service brake adjustment spraying or sealing EASY TO OPERATE The MOLNAR SCISSOR LIFT HOIST is operated wit...

Страница 8: ...of the Scissor Lift Hoist the floor must be flat and level at the anchorage points A level tolerance between bases of 8mm is allowable and 10mm front to rear Check with straight edge and spirit level...

Страница 9: ...his sound is not heard immediately cease using the hoist and call an authorised service agent 6 The following steps are to be taken when lowering the hoist Press the down button twice within 2 seconds...

Страница 10: ...Lubricate safety air cylinders two drops of light oil down the inlet fitting YEARLY Service and safety inspection on the hoist must be performed by a competent person This inspection must be recorded...

Страница 11: ...oints while the hoist is in operation 5 Do not fail to inspect safety devices periodically to see they are in proper working condition 6 Do not make unauthorised changes to safety equipment In emergen...

Страница 12: ...Cylinder 32 1 FP8211300 Spring Cylinder Check Valve 33 1 SL0203300 Spring retainer 35 1 SL0203500 Cylinder welded assembly 38 1 MF8511000 Wear ring 13691WR 43 1 SL0204300 Rod assembly 44 1 SL0204400...

Страница 13: ...Page 13 of 22 Rev B Dec 2009...

Страница 14: ...upply line 7 Attach the hydraulic hose from the control unit to the hoist The connection is under the Left passenger side wheel run up ramp Insure all hydraulic fittings are tight and not leaking refe...

Страница 15: ...be in one hand and with the correct sized spanner in the other hand tighten the nut until the ferrule is felt to just grip the tube This point is determined by rotation or slightly rocking the tube Fr...

Страница 16: ...Page 16 of 22 Rev B Dec 2009 ELECTRICAL DIAGRAM WIRING TO THIS UNIT TO COMPLY WITH AS3000...

Страница 17: ...Page 17 of 22 Rev B Dec 2009 ELECTRONIC DIAGRAM...

Страница 18: ...Page 18 of 22 Rev B Dec 2009 HYDRAULIC DIAGRAM...

Страница 19: ...ctrical contractor to reverse motor rotation direction if incorrect 4 Check safety mechanism for loose nuts or bolts 5 Check compressed air supply pressure is at 6 to 7 bar 6 Check operation of safety...

Страница 20: ...eby certify that the hoist has been checked and is in a safe operating condition and that the purchaser operator has been adequately instructed to operate the hoist Purchaser Model No SL02 Serial No D...

Страница 21: ...Page 21 of 22 Rev B Dec 2009...

Страница 22: ...NUFACTURED BY MOLNAR ENGINEERING PTY LTD A B N 54 007 740 794 16 20 Coglin Street Brompton S A 5007 AUSTRALIA Telephone 08 8346 6893 08 8346 6894 08 8346 8006 Fax 08 8346 0097 Email sales molnarhoists...

Отзывы: