Page 19 of 22
Rev B
–
Dec 2009
INSTALLATION REQUIREMENTS
INSTALLER MUST CHECK THE FOLLOWING LIST WHEN INSTALLING A
MOLNAR SCISSOR LIFT HOIST
1. A suitable floor where the hoist is to be bolted down must have a level surface to
ensure the hoist base frames lie flat. When the hoist is bolted down check all nuts
and bolts to ensure they are correctly tightened.
2. Check for possible transport damage or dislocation.
3. When power is connected to the hoist terminal box, the motor rotation direction
must be clockwise when viewed from above. Consult with electrical contractor to
reverse motor rotation direction if incorrect.
4. Check safety mechanism for loose nuts or bolts.
5. Check compressed air supply pressure is at 6 to 7 bar.
6. Check operation of safety mechanism on both sides, then test hoist with load.
7. Recheck hoist operation. Demonstrate the hoist to the operator.
8.
Very Important
8.1 Instruct operator how to use the hoist, how the safety mechanism
works and where to place lifting pads when lifting vehicles.
8.2 Point out maintenance requirements and that they should be checked monthly.
8.3 Point out that by law, the operator and/or owner are responsible for the
maintenance and safe operation of the hoist.
9. When all the above points are checked the certificate must be signed by the
installer.
Содержание SL02
Страница 1: ...Page 1 of 22 Rev B Dec 2009 MOLNAR SCISSOR LIFT HOIST SL02 INSTALLATION OPERATION MAINTENANCE MANUAL...
Страница 4: ...Page 4 of 22 Rev B Dec 2009 Model SL02 Complies fully with the Australian Standard 1418 9 1996...
Страница 13: ...Page 13 of 22 Rev B Dec 2009...
Страница 16: ...Page 16 of 22 Rev B Dec 2009 ELECTRICAL DIAGRAM WIRING TO THIS UNIT TO COMPLY WITH AS3000...
Страница 17: ...Page 17 of 22 Rev B Dec 2009 ELECTRONIC DIAGRAM...
Страница 18: ...Page 18 of 22 Rev B Dec 2009 HYDRAULIC DIAGRAM...
Страница 21: ...Page 21 of 22 Rev B Dec 2009...