Molnar SL02 Скачать руководство пользователя страница 12

                                                      Page 12 of 22 

           

    

Rev B 

 Dec 2009 

REPLACEMENT PARTS LIST 

 

ITEM NO.  QTY.  PART NO. 

DESCRIPTION 

SL0200100 

Base Assembly 

SL0200400 

 Pivot block assembly 

SL0200500 

Pivot bush full 

SL0200600 

Pivot bush half 

10 

Air Cylinder Assembly 

  

11 

SL0201100 

Outer scissor assembly 

12 

SL0201200 

Torsion Bar Assembly 

14 

M8_10 

  

15 

SL0201500 

Inner scissor assembly 

20 

Circlip DIN 471 - 30 x 1.5    

20 

Circlip DIN 471 - 25 x 1.2    

21 

Circlip DIN 471 - 42 x 1.75   

22 

SL0201900 

Shaft center pivot 

23 

SL0202300 

Acetal Bush2  

23 

SL0202300 

Acetal Bush2  

26 

SL0202600 

Acetal Bush3 

26 

SL0202600 

Acetal Bush3 

27 

Circlip DIN 471 - 12 x 1 

  

28 

SL0202800 

Shaft Run up pivot 

29 

SL0202900 

Ramp Assembly 

30 

SL0203000 

Run up assembly 

31 

MF8511500 

Flow Restrictor Cylinder 

32 

FP8211300 

Spring (Cylinder Check Valve) 

33 

SL0203300 

Spring retainer 

35 

SL0203500 

Cylinder welded assembly 

38 

MF8511000 

Wear ring 13691WR 

43 

SL0204300 

Rod assembly 

44 

SL0204400 

Rod pivot bush 

45 

PL9204500 

Extensions 

46 

SL0204600 

 Top Pivot Pin Assembly 

47 

SL0204700 

Acetal bush4 

48 

SL0204800 

Top section assembly 

49 

SL0204900 

Rod roller shaft guide 

50 

SL0205000 

Bush top roller 

51 

SL0205100 

Roller top 

52 

SL0205200 

Shaft top roller 

55 

SL0205500 

Bush lower roller 

56 

SL0205600 

Lower Roller 

57 

SL0201900 

Shaft bottom roller 

58 

SL0205800 

Air piston 

59 

SL0205900 

Cylinder retaining bush 

60 

Circlip DIN 471 - 25 x 1.2    

61 

BS114 

  

63 

SL0206300 

Air Cylinder 

65 

SL0206500 

Safety Bracket 

65 

Circlip DIN 472 - 26 x 1.2    

66 

SL0206600 

Safety Toggle 

67 

SL0206700 

Safety Bush 

70 

SL0207000 

Run off 

71 

SL0207100 

Cylinder return spring 

73 

SL0207300 

Centre cover 

 

ISO 4762 M8 x 12 --- 12N  M8 x 12 cap screw 

Содержание SL02

Страница 1: ...Page 1 of 22 Rev B Dec 2009 MOLNAR SCISSOR LIFT HOIST SL02 INSTALLATION OPERATION MAINTENANCE MANUAL...

Страница 2: ...gs given as a maximum for circuit motor protection based on DOL selection guide Voltage operating range 6 to 10 of motor nameplate Voltage Motor Voltage 240V Operation range 225V to 264V Cable sizes a...

Страница 3: ...de back cover must be signed by the installer The guarantee card must be completed and returned to MOLNAR ENGINEERING PTY LTD When installed in tropical environments it is advisable to raise the hoist...

Страница 4: ...Page 4 of 22 Rev B Dec 2009 Model SL02 Complies fully with the Australian Standard 1418 9 1996...

Страница 5: ...4mm Maximum raised height 1830mm Minimum lowered height platform 188mm Lifting time working height approx 55 secs Lowering time 3tonnes approx 30 secs Electric motor 3 phase 2 2kw 2700 rpm 415 volts 5...

Страница 6: ...ce SAFE AND EFFICIENT OPERATION Due to an electro hydraulic system which gives years of trouble free service Raising and lowering of vehicle is achieved through an electronic remote controller Sturdy...

Страница 7: ...suspension springs are relaxed facilitating service and repair work Some other uses are wheel service brake adjustment spraying or sealing EASY TO OPERATE The MOLNAR SCISSOR LIFT HOIST is operated wit...

Страница 8: ...of the Scissor Lift Hoist the floor must be flat and level at the anchorage points A level tolerance between bases of 8mm is allowable and 10mm front to rear Check with straight edge and spirit level...

Страница 9: ...his sound is not heard immediately cease using the hoist and call an authorised service agent 6 The following steps are to be taken when lowering the hoist Press the down button twice within 2 seconds...

Страница 10: ...Lubricate safety air cylinders two drops of light oil down the inlet fitting YEARLY Service and safety inspection on the hoist must be performed by a competent person This inspection must be recorded...

Страница 11: ...oints while the hoist is in operation 5 Do not fail to inspect safety devices periodically to see they are in proper working condition 6 Do not make unauthorised changes to safety equipment In emergen...

Страница 12: ...Cylinder 32 1 FP8211300 Spring Cylinder Check Valve 33 1 SL0203300 Spring retainer 35 1 SL0203500 Cylinder welded assembly 38 1 MF8511000 Wear ring 13691WR 43 1 SL0204300 Rod assembly 44 1 SL0204400...

Страница 13: ...Page 13 of 22 Rev B Dec 2009...

Страница 14: ...upply line 7 Attach the hydraulic hose from the control unit to the hoist The connection is under the Left passenger side wheel run up ramp Insure all hydraulic fittings are tight and not leaking refe...

Страница 15: ...be in one hand and with the correct sized spanner in the other hand tighten the nut until the ferrule is felt to just grip the tube This point is determined by rotation or slightly rocking the tube Fr...

Страница 16: ...Page 16 of 22 Rev B Dec 2009 ELECTRICAL DIAGRAM WIRING TO THIS UNIT TO COMPLY WITH AS3000...

Страница 17: ...Page 17 of 22 Rev B Dec 2009 ELECTRONIC DIAGRAM...

Страница 18: ...Page 18 of 22 Rev B Dec 2009 HYDRAULIC DIAGRAM...

Страница 19: ...ctrical contractor to reverse motor rotation direction if incorrect 4 Check safety mechanism for loose nuts or bolts 5 Check compressed air supply pressure is at 6 to 7 bar 6 Check operation of safety...

Страница 20: ...eby certify that the hoist has been checked and is in a safe operating condition and that the purchaser operator has been adequately instructed to operate the hoist Purchaser Model No SL02 Serial No D...

Страница 21: ...Page 21 of 22 Rev B Dec 2009...

Страница 22: ...NUFACTURED BY MOLNAR ENGINEERING PTY LTD A B N 54 007 740 794 16 20 Coglin Street Brompton S A 5007 AUSTRALIA Telephone 08 8346 6893 08 8346 6894 08 8346 8006 Fax 08 8346 0097 Email sales molnarhoists...

Отзывы: