8
ENG
Installation Preparation
1. Carefully remove the ESK from the packaging.
2. Remove the protective covering of the convector trough.
3. Under the protection cover (marked with a point) you will find the
required accessories for connection.
4. The final removal of the trough cover should only be made after
construction is complete.
Installation
Height Adjustment
There are 4 types of Adjustment Blocks for adjusting the height and level-
ling the convector unit:
6 Adjustment Blocks are included with delivery of each ESK: 3 sets of
Outer Adjustment Blocks.
A
Free/Full load Capacity
Interior adjustment blocks for ESK on the fan side are only available with
a distance of 500 mm.
The following applies for free/complete step-on ability in case of exterior
adjustment blocks without support:
• capacity up to 130 kg/m if distance between support max 500 mm
• capacity up to 180 kg/m if distance between support max 400 mm
kg
130
A = 500 mm
kg
180
A = 400 mm
Top view
•
Outer Adjustment Blocks
with Feet JBA 8.80
•
Inner Adjustment Blocks
with Feet JBI 8.80
•
Outer Adjustment Blocks
with Anchors JBA 8.80
• Inner Adjustment Blocks
with Anchors JBI 8.80
The number of included Adjustment Blocks (JB) is only enough for level-
ling purposes! To handle a full load, i.e. for traverse, the ESK must be fur-
ther supported by either a pressure (and heat) resistant insulation or an
increased number of Adjustment Blocks (see free / full load capacities)!
Содержание ESK 180-110
Страница 18: ...18 ENG ...
Страница 19: ...19 ENG 8 D24 53 031 12 ESK 180 110 ...
Страница 20: ......