![Mohlenhoff ESK 180-110 Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/mohlenhoff-0/esk-180-110/esk-180-110_manual_1823432009.webp)
9
ENG
8-D24-53-031.12 ESK 180-110
Installation
1
2
4
3
5
Interior adjustment block: Screw in the threaded bolts
Interior adjustment block: Height adjustment
Levelling
Outer adjustment block: Latch into the trough profile
Outer adjustment block: Fix with screws
2
3
1
4
5
Installation Preparation
To prevent the movement or warping of the ESK during the use of
wet or hot screed, we recommend that the unit be anchored in at
least 4 points to the unfinished floor with Adjustment Blocks!
Protection Cover
Remove the protective cover permanently only after finishing the installati-
on of the system convector and after finishing all building work. By this you
avoid contamination and damage to the system convector.
The electric connection side is marked „
•
“ on the protective cover.
Содержание ESK 180-110
Страница 18: ...18 ENG ...
Страница 19: ...19 ENG 8 D24 53 031 12 ESK 180 110 ...
Страница 20: ......