Suggestion for the first time use
Before you operate the unit for the first time, fill in the salt container with the special salt for the
dishwasher as much as 2 Kg (see how to fill the salt and rinse aid). It is normal if there is a little flood
water and salt indicator lights remain lit for a few cycles after filling the salt.
Put / install the unit
Install the unit at desired place. Put the backside of the unit against the wall behinds it and the sides
on the wall or closet nearby. This dishwasher is equipped with water hose inlet and outlet that can be
positioned to the right or the left to facilitate mounting in the right position.
Adjust the height of Units
At the time of installation, to set the height of the unit can be done by turning the foot inward or
outward of the unit (the slope of the unit should not be more than 2 degrees).
Note:
Legs can be set with a maximum height of 20 mm.
Remove the excess water from the hose
If the sink height is 1000 mm from the floor, the excess water in hose can not be discharged directly
into the sink. The waste water should be stored in tubs or other containers that are placed in the lower
position of the sink height.
Drainage
Connect the drain hose. Drain hose must be installed correctly and tight to prevent the leakage. Make
sure that the inlet and outlet of water hose is not squashed or bent.
Extension / connection Hose
If needed to extend the hose, be sure to use the hose with the same quality and material. Hose length
should not more than 4 meters, if not the quality of the wash will be reduced.
Sewer
The minimum height of the drain is 50 cm to a maximum of 100 cm from the unit base. Tighten the
drain hose using hose clips.
Starting to operate the dishwasher
Before starting to operate the unit, check the following things:
1. The unit has been steadily installed
2. The water channel has been opened
3. There is no leakage at the connection
4. The cable has been installed tightly
5. The electric power is on
6. The hose water already in position in and out is not pinched or bent.
7. The entire packing material has been removed from the unit