15
4
Operation
4
. Operation
4.1 Installation and battery charging
Installing the operating table
1.
Move the operating table to a flat area.
2.
Check the battery lamp.
If the battery lamp (orange) on the control unit flashes, battery
charging is required.
Battery lamp
3.
If the battery indicator shows empty (red), battery charging
is required.
FOOT SWITCH
BATTERY INDICATOR
E
F
POWER SWITCH
POWER CORD
BATTERY INDICATOR
E
F
Red
CAUTION
•
Use the equipotential
wire to ground the
equipotential terminal to
the medical grounding
terminals. Prepare
the equipotential wire
yourself.
•
When moving this
product, carry it out with
two or more persons.
Equipotential wire
Equipotential
terminal
Содержание MOT-VS500DK
Страница 3: ...App 1 Electromagnetic Compatibility 52 App 2 Glossary 55 ...
Страница 4: ......
Страница 60: ...Revision Record New release Ver 1 2020 07 03 ...
Страница 61: ......