
Document #107-00092-001
14
Figure 10 Create New Pump Down Schedule Screen
Edit an Existing Pump Down Schedule
Select the pump down schedule to be edited from the Pump Down list box in the Schedule editor
USER INTERFACE SCREEN. The selected pump down schedule is displayed on the USER
INTERFACE SCREEN. Then change the schedule parameter as necessary and click the Save
button to save the changes to the GLOVEBOX database.
Delete an Existing Pump Down Schedule
To delete an existing pump down schedule in the GLOVEBOX database, highlight the schedule
in the Pump Down Schedule list box and click the Delete button. A dialog box shows up asking
you if you are sure to delete this pump down schedule. Click OK will delete this pump down
schedule from the GLOVEBOX database.