10-1
COOLING SYSTEM
1. Removing cooling system .............10-2
2. Disassembling, inspecting and
reassembling cooling system ........10-3
2.1 Disassembling, inspecting and reassembling
water pump ............................................ 10-3
2.1.1 Inspecting water pump for smooth rotation10-3
2.2 Disassembling, inspecting and reassembling
thermostat .............................................. 10-4
2.2.1 Inspecting thermostat ...............................10-4
3. Installing cooling system ...............10-5
Содержание S3Q2
Страница 2: ......
Страница 4: ......
Страница 16: ......
Страница 38: ......
Страница 39: ...3 1 SERVICE TOOLS 1 General tools 3 2 2 Special tool 3 3 ...
Страница 44: ......
Страница 45: ...4 1 DETERMINATION OF OVERHAUL 1 Determining overhaul timing 4 2 2 Testing compression pressure 4 3 ...
Страница 48: ......
Страница 102: ......
Страница 120: ......
Страница 125: ...COOLING SYSTEM 10 5 3 Installing cooling system Installing cooling system Replace Replace Replace ...
Страница 126: ......
Страница 162: ......
Страница 164: ......
Страница 176: ......