![Mitsubishi S3Q2 Скачать руководство пользователя страница 51](http://html1.mh-extra.com/html/mitsubishi/s3q2/s3q2_service-manual_1809133051.webp)
DISASSEMBLY OF BASIC ENGINE
5-3
1.1 Removing rocker shaft assembly
&$87,21
Always loosen shorter bolts first. Failing to do so may
cause the damage to the rocker shaft bracket.
(1)
Loosen the rocker arm adjusting screws by rotating
about one turn.
(2)
Loosen the shorter rocker bracket bolts first.
(3)
Then, loosen the longer rocker bracket bolts.
(4)
Remove the rokcer bracket bolts, and remove the
rocker shaft assembly from the cylinder head.
(5)
Remove push rods.
Removing rocker shaft assembly
1.2 Disassembling rocker shaft assembly
Disassemble the rocker shaft assembly.
Note: Be sure to arrange the parts in order during
disassembly. Keep the original combination of rocker
arm and shaft assembly, and when reassembling,
make sure to install them in their original positions to
restore the same clearance between the rocker shaft
and arms.
Do not remove the rocker bushing unless it is
defective or its inside diameter exceeds the limit.
Disassembling rocker shaft assembly
1.3 Removing cylinder head assembly
&$87,21
When removing the cylinder head gasket, be careful
not to damage the cylinder head or crankcase surface
by tools such as a screwdriver.
(1)
Remove the cylinder head bolt.
(2)
Remove the cylinder head assembly by lifting it up.
Note: If the cylinder head assembly cannot be removed due
to crimping of the cylinder head gasket, tap the thick
area on the side of the cylinder head using a plastic
hammer to give a shock.
(3)
Remove the gasket from the cylinder head.
Note: If there is a cylinder head problem, check the bolts for
tightness with a torque wrench before removing the
cylinder head bolts.
Removing cylinder head assembly
Содержание S3Q2
Страница 2: ......
Страница 4: ......
Страница 16: ......
Страница 38: ......
Страница 39: ...3 1 SERVICE TOOLS 1 General tools 3 2 2 Special tool 3 3 ...
Страница 44: ......
Страница 45: ...4 1 DETERMINATION OF OVERHAUL 1 Determining overhaul timing 4 2 2 Testing compression pressure 4 3 ...
Страница 48: ......
Страница 102: ......
Страница 120: ......
Страница 125: ...COOLING SYSTEM 10 5 3 Installing cooling system Installing cooling system Replace Replace Replace ...
Страница 126: ......
Страница 162: ......
Страница 164: ......
Страница 176: ......