![Mitsubishi S3Q2 Скачать руководство пользователя страница 174](http://html1.mh-extra.com/html/mitsubishi/s3q2/s3q2_service-manual_1809133174.webp)
No.10
ENGINE INSPECTION RECORD SHEET
X
Measured by
Y
Remar
k
s
Examined by
2
3
①
②
Position
①
②
Y
Approved by
S3Q2,S3Q2-T
Inspection
Item
Unit
Measurement of Clearance between Camshaft Journal Bore
Diameter and Camshaft Bushing
Date
mm [in.]
Model
Camshaft journal
diameter
No. 1, 2
No. 3
Customer
Standards
Engine Serial No.
Measuring positions
①
②
Measured values
Camshaft bushing bore
diameter
X
No.
1
Name
-
Clearance
Maximum
Minimum
Nominal
value
Standard
0.15
[0.0059]
0.07 to 0.11
[0.0028 to 0.0043]
Limit
φ
54
[2.13]
53.94 to 53.96
[2.1236 to 2.1244]
Camshaft journal
diameter
53.90
[2.1220]
φ
53
[2.09]
52.94 to 52.96
[2.0842 to 2.0850]
52.90
[2.0827]
−
Clearance between
camshaft journal diameter
and camshaft bore
diameter of crankcase
-
54.03 to 54.05
[2.1272 to 2.1279]
φ
54
[2.13]
Camshaft bore
diameter
No. 1, 2
No. 3
53.03 to 53.05
[2.0878 to 2.0886]
φ
53
[2.09]
Y
Y
X
X
Ԙ ԙ
Ԙ ԙ
Содержание S3Q2
Страница 2: ......
Страница 4: ......
Страница 16: ......
Страница 38: ......
Страница 39: ...3 1 SERVICE TOOLS 1 General tools 3 2 2 Special tool 3 3 ...
Страница 44: ......
Страница 45: ...4 1 DETERMINATION OF OVERHAUL 1 Determining overhaul timing 4 2 2 Testing compression pressure 4 3 ...
Страница 48: ......
Страница 102: ......
Страница 120: ......
Страница 125: ...COOLING SYSTEM 10 5 3 Installing cooling system Installing cooling system Replace Replace Replace ...
Страница 126: ......
Страница 162: ......
Страница 164: ......
Страница 176: ......