21
8 Check list for user documentation
MITSUBISHI
ELECTRIC
Motion controller installation checklist for manufacturer/installer
The following items must be satisfied by the initial test operation at least. The manufacturer/installer
must be responsible for checking the standards in the items.
Maintain and keep this checklist with related documents of machines to use this for periodic
inspection.
1. Is it based on directive/standard applied to the machine?
Yes [ ], No [ ]
2. Is directive/standard contained in Declaration of Conformity (DoC)?
Yes [ ], No [ ]
3. Does the protection instrument conform to the category required?
Yes [ ], No [ ]
4. Are electric shock protective measures (protection class) effective?
Yes [ ], No [ ]
5. Is the safety observation function checked (test of all the shut-off wiring)? Yes [ ], No [ ]
Checking the items will not be instead of the first test operation or periodic inspection by professional
engineers.
Содержание Q173DSXY
Страница 10: ...9 MEMO ...
Страница 16: ...15 4 4 External wiring diagram DC24V L 1B20 1A11 Internal circuit 1B02 1B01 1A02 1A01 1B10 L 1A05 Only PLC ...
Страница 23: ...22 MEMO ...