![Mitsubishi FR-E800 Series Скачать руководство пользователя страница 70](http://html1.mh-extra.com/html/mitsubishi/fr-e800-series/fr-e800-series_sample-screen-manual_1809262070.webp)
70/79
BCN-P5999-1305-1c
7.5 Connecting GOT and Inverter via PLC (CC-Link IE TSN)
This sample screen can also be used for connecting GOT2000 and MELSEC iQ-R series PLC via Ethernet and
then connecting the PLC and the inverter *1 via CC-Link IE TSN master/local module. *2
The setting example for connection via MELSEC iQ-R CPU and CC-Link IE TSN master/local module is as below.
*1: For the FR-E800-E inverter
*2: Connection via CC-Link IE TSN limits the operation of the operation command screens and
[
Machine Diagnosis
(Load Characteristics. Measurement)] screen. For details, please refer to "8.Limitations".
System Configuration
*1: For more details on the cable, please refer to "GOT2000 Series Connection Manual (Mitsubishi Products)".
Ethernet cable*1
GOT2000
・
GT27**- V(640×480)
・
Interface:
Standard I/F (Ethernet)
(Network No.1, Station No. 18,
IP: 192.168.3.18)
・
MELSEC PLC (RCPU)
(Network No.1, Station No. 1, IP: 192.168.3.39)
+
・
CC-Link IE TSN Module
(Network No.2, Master Station, IP: 192.168.4.253)
Motor
・
FR-E800-E
・
Interface: CC-Link IE TSN
(Network No.2, Station No.1 IP: 192.168.4.50)
Ethernet cable *1