![Mitsubishi FR-E800 Series Скачать руководство пользователя страница 66](http://html1.mh-extra.com/html/mitsubishi/fr-e800-series/fr-e800-series_sample-screen-manual_1809262066.webp)
66/79
BCN-P5999-1305-1c
7.4 Connecting GOT and Inverter via PLC (Ethernet)
This sample screen can also be used for connecting GOT2000 and MELSEC iQ-R/Q/L series PLC via Ethernet and
then connecting the PLC and the inverter*1 via Ethernet interface unit.
The setting example for connection via MELSEC iQ-R CPU and the Ethernet interface unit is as below.
*1: For the FR-E800-E inverter
System Configuration
*1: For more details on the cable, please refer to "GOT2000 Series Connection Manual (Mitsubishi Products)".
Ethernet cable*1
GOT2000
・
GT27**- V(640×480)
・
Interface:
Standard I/F (Ethernet)
(Network No.1, Station No. 18,
IP: 192.168.3.18)
・
MELSEC PLC (RCPU/QCPU/LCPU)
(Network No.1, Station No. 1, IP: 192.168.3.39)
+
・
Ethernet unit
(Network No.2,
Station No. 40, IP: 192.168.4.40)
Motor
・
FR-E800-E
・
Interface: Ethernet
(Network No.2, Station No. 1,
IP: 192.168.4.50)
Ethernet cable*1