![Mitsubishi Heavy Industries L2E Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/mitsubishi-heavy-industries/l2e/l2e_operation-and-maintenance-manual_1812125069.webp)
10-1
Chapter 10 TRANSPORTATION
Lift the engine carefully
:$51,1*
To lift the engine, use wire ropes, shackles and slings
capable of supporting the weight of the engine.
Attach slings to the hangers provided on the engine to
lift the engine.
Keep the engine balanced during lifting by considering
the engine's center of gravity.
Keep the angle formed by slings attached to hangers
within 60 degrees. If the angle exceeds this limit,
excessive load could be applied on the hangers and
cause damage to the hangers.
Attach wire ropes to the hanger after removing the
pipe cover and the insulator near the hanger for lifting.
To prevent wire ropes from contacting the engine, use
a cloth or other soft padding.
Fig. 10-1
Hangers for lifting
)URQWKDQJHU
5HDUKDQJHU