Anti Rolling Gyro
Model:MSM-37500T-A1
−
27
−
CAUTION
Check the bolts and nuts (eight
installation bolts and nuts) for
looseness every three months.
Re-tighten the eight installation bolts or nuts
after operating the
ARG
at sea for a month.
After that, make sure that bolts or nuts are
not loosened every three months. If you
found loosening bolts or nuts, contact the
Sales Agent.
Not doing so could result in malfunction.
Table 6-1
ARG
Periodical inspection List
(
1 / 4
)
No
Inspection
Area
Inspection Item
Priority
Result Countermeasures
1
There must be no rust,
crack or gap on the
installation part of the
hull.
○
Improve the hull to
solve the problem.
2
There must be no
permanent deformation
in the anti-vibration
rubber.
○
Contact the Sales
Agent.
Change the
anti-vibration
rubber
3
The installation bolts
and nuts must be
tightened to the regular
torque as below.
300N
・
m
○
Re-tighten bolts or
nuts.
4
ARG
Installation
There must be no dust,
combustibles/flammable
materials or
seawater/water near the
ARG
unit.
◎
Improve
installation
environment.