34
A How to check inverter/compressor
Are the voltages balanced?
Disconnect the connector between compressor
and the intelligent power module (IPM).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See
D
“Check of compressor”.
No
Yes
See
B
“Check of open phase”.
With the connector between the compressor and the intelligent power module disconnected, activate the inverter and check if
the inverter is normal by measuring the balance of voltage between the terminals.
The output voltage values have the tolerance of ± 20%.
<< Operation method(Test run operation)>>
1. Press the EMERGENCY OPERATION switch or the Test button to COOL or HEAT mode.
2. Test run operation starts and continues to operate for 30 minutes.
3. Compressor starts at rated frequency in COOL mode or 58Hz in HEAT mode.
4. Indoor fan operates at High speed.
5. After 30 minutes, test run operation finishes and EMERGENCY OPERATION starts.
6. To cancel test run operation (EMERGENCY OPERATION), press the EMERGENCY OPERATION switch or the ON/OFF
button on remote controller.
<<Measurement point>>
At 3 points
BLK (U) - WHT (V)
BLK (U) - RED (W)
WHT (V) - RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board
fl
ashes 9 times. (Refer to 11-6-1, 11-6-2)
Refer to
f
“Check of compressor operation
time”.
Does the compressor operate continuously?
Check the refrigerant circuit.
OK.
No
Yes
Refer to
e
“Check of compressor winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
C Check of compressor
B Check of open phase
[SUZ-KA25/35/50VA2.TH]
9-time flash
2.5-second OFF
Is the compressor
operation time more than
10 seconds?
No
Replace the compressor.
Yes
11-5. Troubleshooting flow
Содержание SUZ-KA25VA2
Страница 16: ...16 SUZ KA71VA2 TH ...
Страница 73: ...73 ...