95
OPERATING PROCEDURE
PHOTOS
3. Removing the electrical parts box
(1) Remove the service panel. (See Figure 1)
(2) Remove the top panel. (See Figure 1)
(3) Disconnect the power supply cable from terminal block.
(4) Disconnect the indoor/outdoor connecting wire from
terminal block.
(5) Disconnect the connector CNF1 (WT), CNF2 (WT), TH3
(WT), TH4 (WT), TH7/ 6 (RD), TH32 (BK), TH33 (YE),
63H (YE), 63L (RD), 21S4 (GN), LEV-A (WT), LEV-B (RD),
LEV-C (BU) from the controller circuit board.
<Symbols on the board>
• Fan motor (CNF1, CNF2)
• Thermistor <Liquid> (TH3)
• Thermistor <Discharge> (TH4)
• Thermistor <Ambient/2-Phase Pipe> (TH7/6)
• Thermistor <Suction> (TH32)
• Thermistor <Ref. check> (TH33)
• High pressure switch (63H)
• Low pressure switch (63L)
• 4-way valve (21S4)
• LEV (LEV-A, LEV-B, LEV-C)
(6) Loosen the clamps, fasteners and cable strap for the lead
wire in the electrical parts box and separator.
(7) Loosen the lead wires fixed to the pipes with bands.
(8) To disconnect the COMP lead wire, remove the terminal
cover.
(9) Remove the electrical parts box fixing screw (1 for front/
4 x 10), then slide the electrical parts box upward to
remove it.
(The electrical parts box is fixed to the side panel (R)
with a hook on the right side, and to the separator with a
hook on the left side.)
Photo 3
Electrical
parts box
Controller circuit board(C.B.)
Electrical
parts box
fixing screw
Terminal cover
Compressor
(MC)
Terminal block
(TB1)
Cover panel
(rear)
Side panel
(R)
Valve bed
OCH607
Содержание PUZ-HA30NHA5
Страница 99: ...99 OCH607 ...