54
OCH665B
10-10. FUNCTION OF SWITCHES, CONNECTORS AND JUMPERS
(1) Function of switches
*1
Manual defrost should be done as follows.
1
Change the DIP SW1-1 on the outdoor controller board from OFF to ON.
2
Manual defrost will start by the above operation
1
if all these conditions written below are satisfied.
• Heat mode setting
• 10 minutes have passed since compressor started operating or previous manual defrost is finished.
• Pipe temperature is less than or equal to 8°C.
Manual defrost will finish if certain conditions are satisfied.
Manual defrost can be done if above conditions are satisfied when DIP SW1-1 is changed from OFF to ON.
After DIP SW1-1 is changed from OFF to ON, there is no problem if DIP SW1-1 is left ON or changed to OFF again.
This depends on the service conditions.
The black square ( ) indicates a switch position.
Type
of
switch
Switch No.
Function
Action by the switch operation
Effective timing
ON
OFF
Dip
switch
SW1
1
Manual defrost
*1
Start
Normal
When compressor is working
in ATA heating and ATW
heating operation.
*1
2
Abnormal history clear
Clear
Normal
OFF or operating
3
Refrigerant address setting
When power supply ON
4
5
6
SW4
1
Test run
Operating
OFF
OFF
2
Test run mode setting
ATA Heating
ATA Cooling
Push
switch
SWP
Pump down
Start
Normal
OFF
1 2 3
0
1
2
3
4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
1 2 3
4
5
6
7
4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
1 2 3
8
9
10
11
4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
1 2 3
12
13
14
15
4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
1 2 3 4 5 6
ON
Содержание PUHZ-FRP71VHA2R1
Страница 12: ...12 OCH665B 7 WIRING DIAGRAM PUHZ FRP71VHA2 PUHZ FRP71VHA2R1 ...
Страница 89: ...89 OCH665B ...