[
III
Outdoor Unit Components ]
- 56 -
HWE0804A
GB
(3) PUHY-P72, P96, P120YHMU-A
1) Before inspecting the inside of the control box, turn off the power, keep the unit off for at least 10 minutes, and confirm that
the voltage between FT-P and FT-N on INV Board has dropped to DC20V or less.
(It takes about 10 minutes to discharge electricity after the power supply is turned off.)
SC-L1
Input(L1)
SC-L2
Input(L2)
SC-L3
Input(L3)
IGBT
(Rear)
Bus voltage check
terminal (P)
Note
Bus voltage check
terminal (N)
Note 1
SC-P2
Bus voltage Input(P)
SC-P1
Rectifier diode output (P)
LED1
Lit: Inverter in normal operation
Blink: Inverter error
CN6
Open: No-load operation setting
Short-circuited: Normal setting
CN5V
GND
Output 5VDC
RSH1
Overcurrent detection
resistor
CN4
GND(INV Board)
Serial communication
signal output
CN2
Serial communication
signal output
GND
Input 17VDC
SC-V
Inverter output(V)
CNTYP Inverter
board type
SC-W
Inverter output(W)
SC-U
Inverter output(U)
CT22
Current sensor(W)
CT12
Current sensor(U)
C30 C37
Smoothing capacitor
CN1
Bus voltage output
N
P
CT3
Current sensor(L3)
Содержание PUHY-P120YHMU-A
Страница 1: ......
Страница 9: ...HWE0804A GB ...
Страница 11: ... 2 ...
Страница 23: ... 14 ...
Страница 25: ... 16 ...
Страница 55: ... 46 ...
Страница 71: ... 62 ...
Страница 73: ... 64 ...
Страница 81: ... 72 ...
Страница 83: ... 74 ...
Страница 88: ... 79 HWE0804A GB VI Refrigerant Circuit 1 Refrigerant Circuit Diagram 81 2 Principal Parts and Functions 82 ...
Страница 89: ... 80 ...
Страница 95: ... 86 ...
Страница 97: ... 88 ...
Страница 123: ... 114 ...
Страница 157: ... 148 ...
Страница 279: ... 270 ...
Страница 280: ... 271 HWE0804A GB X LED Monitor Display on the Outdoor Unit Board 1 How to Read the LED on the Service Monitor 273 ...
Страница 281: ... 272 ...
Страница 326: ......