After the leak test, apply insulating 

material tightly so that there is 

no gap.

When the piping is to be attached 

to a wall containing metals (tin 

plated) or metal netting, use a 

chemically treated wooden piece 

20 mm or thicker between the wall 

and the piping or wrap 7 to 8 turns 

of insulation vinyl tape around 

the piping.

To use existing piping, perform 

COOL operation for 30 minutes 

and pump down before removing 

the old air conditioner. Remake 

flare according to the dimension 

for new refrigerant.

More than 

100 mm

Open as a rule

More than 500 mm 

if the front and both 

sides are open

More than 100 mm 

More than 200 mm if there are 

obstacles to both sides

Open as a rule

More than 500 mm if the back, 

both sides and top are open

More than 350 mm

1-5. INSTALLATION DIAGRAM

ACCESSORIES

Check the following parts before installation.

(1) Drain socket

1

(2)

Drain cap

2

PARTS TO BE PROVIDED AT YOUR SITE

(A) Power supply cord*

1

(B) Indoor/outdoor unit connecting wire*

1

(C)

Extension pipe

1

(D)

Wall hole cover

1

(E) Piping tape

1

(F)

Extension drain hose 

(or soft PVC hose, 15 mm inner 

diameter or hard PVC pipe VP16)

1

(G)

Refrigeration oil

Little 

amount

(H) Putty

1

(I) Pipe fixing band

2 to 7

(J) Fixing screw for (I)

2 to 7

(K)

Wall hole sleeve

1

(L)

Soft PVC hose, 15 mm inner 

diameter or hard PVC pipe VP16 

for drain socket (1)

1

Note:

*Place indoor/outdoor unit connecting wire (B) and 

power supply cord (A) at least 1 m away from the 

TV antenna wire.

The “Q’ty” for (B) to (K) in the above table is quantity 

to be used per indoor unit.

Units should be installed by licensed contractor 

according to local code requirements.

Outdoor unit installation

Air inlet

169

500

Air inlet

4-10 × 21 Oval holes

396

Air outlet

840

(Unit: mm)

361

330

1-6. DRAIN PIPING FOR OUTDOOR UNIT

Please perform the drain piping work only when draining from one place.

1) Choose one hole to discharge drain and install the drain socket (1) to the hole.

2) Close the rest of the holes with the drain caps (2).

3) Connect the soft PVC hose (L) of 15 mm in the inside diameter on the market with the drain socket (1) and lead drain.

Note:

Install the unit horizontally.

Do not use the drain socket (1) and the drain caps (2) in the cold regions. Drain may freeze and it makes the fan stop. 

The outdoor unit produces condensate during the heating operation. Select the installation place to ensure to prevent the outdoor unit and/or the grounds from 

being wet by drain water or damaged by frozen drain water.

100 or more

500 or more

100 or more

Service space

350 or more 

350 or more

6. 

Service space

Provide space for service and maintenance as shown in the figure.

•  When installing the unit in an area that is enclosed with walls such 

as a verandah, be sure to have enough space as shown below. 

  In this case, the air conditioning capacity and power consumption 

might deteriorate.

•  When there is a lack of airflow or there is a possibility of becoming 

short cycle, install an outlet guide and make sure there is enough 

space behind of the unit.

•  When installing two or more units, do not install the units in front or 

behind each other.

5. 

Obstacles in front, behind and on side(s)

200 or more

100 or more

350 or more

500 or more

500 or more

Height of the obstacle is 1200 or less

(Unit: mm)

Содержание MXZ-2E52VAD2

Страница 1: ...ner MXZ 2E52VAD2 MXZ 3E54VAD2 MXZ 4E71VAD2 English Installation Manual For INSTALLER This manual only describes the installation of outdoor unit When installing the indoor unit refer to the installation manual of indoor unit ...

Страница 2: ...the system will cause mechanical failure system malfunction or unit breakdown In the worst case this could lead to a serious impediment to securing product safety n Do not discharge the refrigerant into the atmosphere If refrigerant leaks during installation ventilate the room If refrigerant comes in contact with a fire harmful gas could be generated n Check that the refrigerant gas does not leak ...

Страница 3: ...E INSTALLATION LOCATION Where it is not exposed to strong wind Where airflow is good and dustless Where rain or direct sunshine can be avoided as much as possible Where neighbours are not annoyed by operation sound or hot air Where rigid wall or support is available to prevent the increase of opera tion sound or vibration Where there is no risk of combustible gas leakage When installing the unit b...

Страница 4: ...or unit Units should be installed by licensed contractor according to local code requirements Outdoor unit installation Air inlet 169 500 Air inlet 4 10 21 Oval holes 396 Air outlet 840 Unit mm 361 330 1 6 DRAIN PIPING FOR OUTDOOR UNIT Please perform the drain piping work only when draining from one place 1 Choose one hole to discharge drain and install the drain socket 1 to the hole 2 Close the r...

Страница 5: ...ling devise DRED For further information consult your dealer This unit supports 3 Demand Response Modes DRMs DRM1 DRM2 and DRM3 CAUTION To prevent malfunction caused by noise route the cord connecting this unit to DRED and the power supply cord as parallel as possible Do not connect the demand control transmission cable to the terminal block for power supply Do not pull extremely bend or apply str...

Страница 6: ...ue 19 6 to 29 4 N m 200 to 300 kgf cm Gauge manifold valve for R410A Compound pressure gauge for R410A 0 101MPa 760 mmHg Handle Low Handle High Vacuum pump for R410A Close Open Hexagonal wrench 4 to 5 turns Stop valve for LIQUID Pressure gauge for R410A Precautions when us ing the control valve When attaching the control valve to the service port valve core may deform or loosen if excess pres sure...

Страница 7: ...rvice port of the stop valve on the gas pipe side of the outdoor unit 3 Fully close the stop valve on the liquid pipe side of the outdoor unit 4 Turn on the breaker 5 Start the emergency COOL operation on all the indoor units 6 When the pressure gauge shows 0 05 to 0 MPa Gauge approx 0 5 to 0 kgf cm2 fully close the stop valve on the gas pipe side of the outdoor unit and stop the operation Refer t...

Страница 8: ...BH79N583H01 HEAD OFFICE TOKYO BUILDING 2 7 3 MARUNOUCHI CHIYODA KU TOKYO 100 8310 JAPAN ...

Отзывы: