12-1. MUZ-FH25VE
MUZ-FH35VE
NOTE
: Turn OFF power supply before disassembly.
OPERATING PROCEDURE
PHOTOS
1. Removing the cabinet
(1) Remove the screw fixing the service panel.
(2) Pull down the service panel and remove it.
(3) Disconnect the power supply and indoor/outdoor con-
necting wire.
(4) Remove the screws fixing the top panel.
(5) Remove the top panel.
(6) Remove the screws fixing the cabinet.
(7) Remove the cabinet.
(8) Remove the screws fixing the back panel.
(9) Remove the back panel.
Photo 1
Photo 2
48
(1) Slide the sleeve and check if there is a locking lever or not.
(2) The terminal with this connector has the
locking mechanism.
Slide the sleeve.
Pull the terminal while
pushing the locking
lever.
Hold the sleeve, and
pull out the terminal
slowly.
Connector
Sleeve
Locking lever
Back
panel
Service
panel
Screws of the
top panel
Screws of
the cabinet
Screws of
the top panel
Screw of the
service panel
Direction to
remove
Screws of
the cabinet
Hooks
<"Terminal with locking mechanism" Detaching points>
The terminal which has the locking mechanism can be detached as shown below.
There are two types (refer to (1) and (2)) of the terminal with locking mechanism.
The terminal without locking mechanism can be detached by pulling it out.
Check the shape of the terminal before detaching.
DISASSEMBLY INSTRUCTIONS
12
Screw of the
cabinet
Screws
of the
back
panel
Screws of
the terminal block
support and the
back panel
OBH624B
Содержание MUZ-FH25VE-E1
Страница 9: ...9 WIRING DIAGRAM 6 MUZ FH25VE E1 MUZ FH35VE E1 MUZ FH25VE E2 ER1 ER2 MUZ FH35VE E2 ER1 ER2 OBH624B ...
Страница 10: ...10 MUZ FH50VE E1 OBH624B ...
Страница 11: ...11 MUZ FH50VE ER1 OBH624B ...
Страница 47: ...47 2 Relay P C board MUZ FH50VE To inverter P C board CN681 CN680 CN60 L68B L68A 10 VDC OBH624B ...