34
11-5. TROUBLESHOOTING FLOW
A How to check inverter/compressor
Refer to 11-5. “Check of compressor
operation time”.
Does the compressor operate continuously?
Refer to 11-5. “Check of compressor start failure”.
OK.
No
Yes
Refer to 11-5. “Check of compressor
winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
B Check of open phase
C Check of compressor
●
With the connector between the compressor and the power module (IC700)
(MUZ-FH25/35
)/IGBT module (IC700) (
MUZ-FH50
)
disconnected, activate the inverter and check if the inverter is normal by measuring
the voltage balance
between the termi-
nals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 8-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board
fl
ashes 9 times. (Refer to 11-6.1.)
Measure AC voltage between the lead wires at 3 points.
Are the voltages balanced?
Disconnect the connector between the compressor
and the power module (IC700) (
MUZ-FH25/35
)/IGBT
module (IC700) (
MUZ-FH50
).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See 11-5. “Check of compressor”.
No
Yes
See 11-5. “Check of open phase”.
OBH624B
Содержание MUZ-FH25VE-E1
Страница 9: ...9 WIRING DIAGRAM 6 MUZ FH25VE E1 MUZ FH35VE E1 MUZ FH25VE E2 ER1 ER2 MUZ FH35VE E2 ER1 ER2 OBH624B ...
Страница 10: ...10 MUZ FH50VE E1 OBH624B ...
Страница 11: ...11 MUZ FH50VE ER1 OBH624B ...
Страница 47: ...47 2 Relay P C board MUZ FH50VE To inverter P C board CN681 CN680 CN60 L68B L68A 10 VDC OBH624B ...