background image

S3

S3

S2

S1

S2

S1

L N

9

6. Electrical work

6.1. Outdoor unit (Fig. 6-1, Fig. 6-2)

 

  Remove the service panel.

 

  Wire the cables referring to the Fig. 6-1 and the Fig. 6-2.

Fig. 6-1

 Indoor unit

 Outdoor unit

 Remote controller

  Main switch (Breaker)

 Earth

Fig. 6-2

For Power

For Power

L

N

S1 S2 S3

ZRP60-140V

L1 L2 L3 N

S1 S2 S3

ZRP100-140Y

Terminal block

Indoor/Outdoor connection terminal block (S1, S2, S3)

Service panel

Clamp

*   Clamp the cables so that they do not contact the center of the service panel or the gas valve.

Earth terminal


 

ZRP35, 50

 

ZRP35, 50

Note : 
If the protective sheet for the electrical box is removed during servicing, be sure to 
reinstall it.

 

ZRP60-140

 Caution:

Be sure to install N-Line. Without N-Line, it could cause damage to unit.

Содержание Mr. Slim PUHZ-ZRP-HA

Страница 1: ...ding van het binnenapparaat zorgvuldig door voordat u met het installeren van de airconditioner begint MANUAL DE INSTALACIÓN Para un uso correcto y seguro lea detalladamente este manual y el manual de instalación de la unidad interior antes de instalar la unidad de aire acondicionado MANUALE DI INSTALLAZIONE Per un uso sicuro e corretto leggere attentamente il presente manuale ed il manuale d inst...

Страница 2: ...m malfunction or unit breakdown In the worst case this could lead to a serious impediment to securing product safety Use only accessories authorized by Mitsubishi Electric and ask a dealer or an authorized technician to install them If accessories are incorrectly installed water leakage electric shock or fire may result Do not alter the unit Consult a dealer for repairs If alterations or repairs ar...

Страница 3: ...The refrigerant pipes are hot or cold depending on the condition of the flowing refrigerant If you touch the pipes burns or frostbite may result After stopping operation be sure to wait at least five minutes before turn ing off the main power switch Otherwise water leakage or breakdown may result 1 5 Using R410A refrigerant air conditioners Caution Use C1220 copper phosphorus for copper and copper a...

Страница 4: ...bove only Fig 2 13 No more than 3 units must be installed side by side In addition leave space as shown Do not install the optional air outlet guides for upward airflow Obstacles at front only Fig 2 14 When using an optional air outlet guide the clearance for ZRP100 140 models is 1000 mm or more Obstacles at front and rear only Fig 2 15 When using an optional air outlet guide the clearance for ZRP1...

Страница 5: ...Precautions for devices that use R410A refrigerant Refer to 1 5 for precautions not included below on using air conditioners with R410A refrigerant Use ester oil ether oil alkylbenzene oil small amount as the refrigeration oil applied to the flared sections Use C1220 copper phosphorus for copper and copper alloy seamless pipes to connect the refrigerant pipes Use refrigerant pipes with the thicknes...

Страница 6: ...he gas side Stop valve Use 2 wrenches to tighten the flare nut If order is reversed refrigerant leak occurs because of the part damaging by brazinig fire 4 Installing the refrigerant piping Fig 4 4 Front piping cover Piping cover Stop valve Service panel Bend radius 100mm 150mm 4 3 Refrigerant piping Fig 4 4 For ZRP35 50 Remove the service panel 1 screw For ZRP60 140 Remove the service panel 3 screw...

Страница 7: ...p the pipes Pipe inlet gap for ZRP60 140 Use putty or sealant to seal the pipe inlet around the pipes so that no gaps re main If the gaps are not closed noise may be emitted or water and dust will enter the unit and breakdown may result 4 6 Addition of refrigerant Additional charging is not necessary if the pipe length does not exceed 30 m If the pipe length exceeds 30 m charge the unit with addit...

Страница 8: ...he existing pipe thickness does not meet specifications or the pipes are damaged 4 Installing the refrigerant piping ZRP35 50 ZRP60 71 ZRP100 140 Drain socket PAC SJ08DS E PAC SH71DS E Drain pan PAC SG63DP E PAC SG64DP E PAC SH97DP E 5 Drainage piping work Outdoor unit drainage pipe connection When drain piping is necessary use the drain socket or the drain pan option Limits of refrigerant piping i...

Страница 9: ...r L N S1 S2 S3 ZRP60 140V L1 L2 L3 N S1 S2 S3 ZRP100 140Y Terminal block Indoor Outdoor connection terminal block S1 S2 S3 Service panel Clamp Clamp the cables so that they do not contact the center of the service panel or the gas valve Earth terminal ZRP35 50 ZRP35 50 Note If the protective sheet for the electrical box is removed during servicing be sure to reinstall it ZRP60 140 Caution Be sure ...

Страница 10: ...an inverter The use of an inadequate breaker can cause the incorrect operation of inverter 2 ZRP35 140 Max 45 m If 2 5 mm2 used Max 50 m If 2 5 mm2 used and S3 separated Max 80 m Use one cable for S1 and S2 and another for S3 as shown in the picture Max 50 m Total Max for PEA Wiring size 3 1 5 Polar 3 The 10 m wire is attached in the remote controller accessory 4 The figures are NOT always against ...

Страница 11: ...tarting operation Starting operation immediately after turning on the main power switch can result in severe damage to internal parts Keep the power switch turned on during the operational season The followings must be checked as well The outdoor unit is not faulty LED1 and LED2 on the control board of the out door unit flash when the outdoor unit is faulty Both the gas and liquid stop valves are c...

Страница 12: ...le there is no need of wiring Outdoor unit Indoor unit Master remote controller Subordinate remote controller Standard 1 1 Refrigerant address 00 Simultaneous twin Refrigerant address 01 Simultaneous triple Refrigerant address 02 SW 1 3 6 SW 1 3 6 SW 1 3 6 Fig 9 1 Because the unit automatically stops in about 2 to 3 minutes when the refriger ant collecting operation is completed LED1 off LED2 lit ...

Отзывы: