60
10
DISASSEMBLY PROCEDURE
OPERATING PROCEDURE
PHOTOS & ILLUSTRATIONS
1. Removing the air intake grille
(1) Slide the intake grille holding knobs (at 2 locations) back-
ward to open the intake grille.
(2) When the intake grille left open, push the stoppers on the
rear hinges (at 2 locations) to pull out the intake grille.
2. Removing the electrical box
(1) Remove the air intake grille.
(2) Remove the screw from the beam and remove the beam.
(3) Remove the screws from the electrical cover, and
remove the electrical cover.
(4) Disconnectors including CN6V and CN21.
(5) Remove the screws from the electrical box and pull out
the electrical box.
<Electrical parts in the electrical box>
Terminal block (for power supply)
Terminal block (for in/outdoor connecting wire)
Terminal block (for remote controller)
Fan motor capacitor
Indoor control board
Indoor power board
Figure 1
Figure 2
slide
Intake grille
Intake grille
holding knobs
Hinges
Pull out the intake grille
Electrical cover
Screw(electrical cover)
Screw(electrical box)
Slide to the left
Beam
Clamp
PC-2GAKD PC-2.5GAKD PC-3GAKD PC-4GAKD PC-5GAKD PC-6GAKD
Photo 1
Fan motor
capacitor
Power board
Relay (PCH only)
Indoor
control
board
Terminal
block
(Electric heater)
Terminal
block
(Indoor / outdoor
connecting line)
Terminal
block
(remote control)
OC382B--2.qxp 08.2.19 8:28 AM Page 60