19
PC-5GAKD
PC-6GAKD
1
Drainage pipe connection (Unit side : 26mm I.D.)
5
Refrigerant-pipe connection (liquid pipe side/flared connection)
2
Drainage pipe connection (for the left arrangement)
6
Knockout hole for upper pipe arrangement
3
Knockout hole for left drain-piping arrangement
7
Knockout hole for left pipe arrangement
4
Refrigerant-pipe connection (gas pipe side/flared connection)
8
Knockout hole for wiring arrangement
NOTES:
1. Use M10 or W3/8 screws for anchor bolt.
2. When installing the drain-up machine (option parts),
please be sure that refrigerant pipe will be only upper pipe arrangement.
Unit : mm(inch)
[FRONT VIEW]
1535
680
254
Air intake
1524
270
207
81
96
1620
Air outlet
1547(suspension bolt pitch)
140
150
320
80
18
70
6
87
182
198
245
16
217
(3/8 liquid)
(3/4 gas)
(Drainage)
3
2
8
5
1
4
Electrical box
When electrical
box is pulled
down
Celling
93
160
38
38
140
42
239
6~7
525
1545
687
263
171
138
86
192
236
1
45
1
2
Electrical
box
70
229
Gap to ceiling
OC382B--1.qxp 08.2.19 8:29 AM Page 19