
CHAPTER6 FUNCTIONS
1
2
3
4
5
6
7
8
6.13 Execution
Time Measurement
6.13.1
P
rogram
monitor
list
6
-
71
Remark
When the POFF instruction is executed, a non-execution processing is performed for one scan.
The number of execution times displayed is the addition of the execution times of the non-execution processing.
For details of the POFF instruction, refer to the following.
QCPU Programming Manual (Common Instructions)
(3) Program start and stop
Program cannot be started and stopped from the Program list monitor screen.
(4) Precautions
The scan time of a fixed scan execution type program is not displayed during its execution.
"-" is displayed in the Scan time column.
Содержание melsec q00ucpu
Страница 2: ......
Страница 3: ......
Страница 13: ...A 10 Memo ...
Страница 620: ......
Страница 621: ......