69
MITSUBISHI ELECTRIC
/ REPLACE TECHNOLOGY - COMMERCIAL
R410A
Commercial line
P SERIES -
PUHZ-ZRP/PUHZ-SHW
<Table 5> Maximum pipe lenght (ZRP140)
ZRP140(RP50×3
Main pipe
(mm) [A]
Liquid pipe
ø9.52
ø9.52
ø12.7
Gas pipe
ø15.88
ø19.05
ø19.05
Branch pipe
(mm) [B, C]
Liquid pipe
ø6.35
Standard size
50m
[30m]
50m
[30m]
50m
[20m]
Gas pipe
ø12.7
Liquid pipe
ø9.52
50m
[30m]
50m
[30m]
50m
[20m]
Gas pipe
ø15.88
Liquid pipe
ø12.7
Gas pipe
ø19.05
(3) TRIPLE SYSTEM
<Table 6> Maximum pipe lenght (Main pipe [A] + Branch pipe [B, C e D]) (ZRP200, 250)
ZRP200 triple (RP60×3)
Linea Principale
(mm)[A]
Liquid pipe
ø9.52
ø12.7
ø15.88
Gas pipe
ø19.05
ø22.2
ø25.4
ø28.58
ø19.05
ø22.2
ø25.4
ø28.58
ø22.2
ø25.4
ø28.58
ø31.75
Linee secon-
darie
(mm) [B, C, D]
Liquid pipe
ø6.35
20m
[20m]
50m
[30m]
Standard
size
120m
[30m]
120m
[30m]
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
50m
[20m]
50m
[20m]
50m
[20m]
50m
[20m]
Gas pipe
ø12.7
Liquid pipe
ø9.52
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
50m
[20m]
50m
[20m]
50m
[20m]
50m
[20m]
Gas pipe
ø15.88
Liquid pipe
ø12.7
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
50m
[20m]
50m
[20m]
50m
[20m]
50m
[20m]
Gas pipe
ø19.05
<Table 6> Maximum pipe lenght (Main pipe [A] + Branch pipe [B, C e D]) (ZRP200, 250)
ZRP250 triple (RP71×3)
Linea Principale
(mm)[A]
Liquid pipe
ø9.52
ø12.7
ø15.88
Gas pipe
ø19.05
ø22.2
ø25.4
ø28.58
ø19.05
ø22.2
ø25.4
ø28.58
ø22.2
ø25.4
ø28.58
ø31.75
Linee secon-
darie
(mm) [B, C, D]
Liquid pipe
ø6.35
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
20m
[20m]
50m
[30m]
Diam.
standard
120m
[30m]
120m
[30m]
50m
[20m]
50m
[20m]
50m
[20m]
50m
[20m]
Gas pipe
ø12.7
Liquid pipe
ø9.52
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
50m
[20m]
50m
[20m]
50m
[20m]
50m
[20m]
Gas pipe
ø15.88
Liquid pipe
ø12.7
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
20m
[20m]
50m
[30m]
120m
[30m]
120m
[30m]
50m
[20m]
50m
[20m]
50m
[20m]
50m
[20m]
Gas pipe
ø19.05
Marks in the table
: It can be used.
: Cooling capacity is lowered.
: Additional refrigerant charge is required when the pipe lenght
exceeds 20 m.
50m
[30m]
The maximum pipe lenght.
Charge-less pipe lenght.
Содержание M-SERIES
Страница 1: ...Practical installation guide DX ...
Страница 2: ......
Страница 3: ......
Страница 5: ...3 ...
Страница 37: ...35 ...
Страница 39: ...37 MITSUBISHI ELECTRIC COMMERCIAL ...
Страница 49: ...47 ...
Страница 61: ...59 MITSUBISHI ELECTRIC REPLACE TECHNOLOGY ...
Страница 75: ...73 MITSUBISHI ELECTRIC REPLACE TECHNOLOGY COMMERCIALE ...
Страница 76: ...74 Ventilation ...
Страница 77: ...75 MITSUBISHI ELECTRIC VENTILATION ...
Страница 111: ...109 ...
Страница 118: ......
Страница 119: ......