3. Installation flow chart

SAFETY HANDLING FOR R32

3. Installation flow chart

Using the flowchart, make sure the installation restrictions that apply to R32 HVRF models are met.
Even if "Installation OK" is reached in the flowchart, see "Installation chart annex".

*This flow chart was created based on IEC60335-2-40 (ver. 6) and ISO5149 (2014).

Ventilation 

system  is located in the 

space where Hydro unit/HBC 

is installed.

The 

ventilation ratio of the 

ventilation system is 4 

times or more.

The 

extraction opening 

of the ventilation system is 

located at the height of 

100mm or lower from 

the floor.

Hydro 

unit/HBC is 

installed in the space where 

the refrigerant concentration is less 

than 0.063 (kg/m

3

) when 

refrigerant 

leaks. 

Hydro 

unit/HBC is installed 

in the space where the 

refrigerant concentration is less 

than 0.16 (kg/m

3

) when 

refrigerant 

leaks.

Unauthorized 

person is prohibited to enter 

the space where Hydro unit/HBC 

is installed.

Combustion 

equipment is NOT placed in 

the space where Hydro unit/HBC 

is installed.

Hydro 

unit/HBC is installed at 

the height of  1.8m or 

higher.

Hydro 

unit/HBC is installed on 

the ceiling of a space except on 

the lowest basement 

floor.

Alarm 

required by applicable 
regulations is installed 

additionally.

START

START

Installation OK

Installation OK

(1) Machinery room 

installation

(Continuous ventilation)

Machinery room

installation

Small room 

installation

NO

NO

NO

NO

NO

Installation OK

Installation OK

(2) Small room 

installation 

(No safety measures)

Installation OK

Installation OK

(3) Small room 

installation

(Alarm)

NO

NO

NO

NO

NO

<Air volume 
requirement>
IEC/GG.5
ISO/part3-5.13.2

<Lowest 
basement floor 
requirement>
IEC/GG.10.3.1
ISO/part1-A.5.2.2

<Alarm 
requirement>
IEC/GG.13
ISO/part3-8

<Refrigerant 
concentration 
determination>
IEC/GG.10.4
      /GG.10.5
ISO/part1-A.5.2.2
      /A.5.2.3

<Circulation 
requirement>
IEC/GG.10.2

<Extraction opening 
requirement>
IEC/GG.8.3.3
ISO/
part3-5.13.1 and 5

<Restricted access 
requirement>
IEC/GG.5
ISO/part1-3.2.5
      (part3-5.1)

<Combustion 
equipment restriction>
IEC/GG.5
ISO/part3-5.14.3

YES

YES

YES

YES

YES

YES

YES

YES

YES

YES

0000005090.BOOK  6 ページ  2018年12月27日 木曜日 午前10時3分

Содержание HYBRID CITY MULTI Series

Страница 1: ... 2 Confirm the Critical concentration and take countermeasure 2 2 Installation restrictions 3 2 1 Installing the outdoor unit or the Hydro unit outdoor 3 2 2 Installing the Hydro unit or the HBC indoor 5 3 Installation flow chart 6 4 Installation chart annex 10 5 Regulatory requirements list for safety measures 13 0000005090 BOOK 1 ページ 2018年12月27日 木曜日 午前10時3分 ...

Страница 2: ...ration Rmax is over 0 063kg m3 If no then the HYBRID CITY MULTI is safe against refrigerant leakage If yes following countermeasure is recommended to do at site Countermeasure 1 Smaller total charge making Wmax smaller e g Avoid connecting more than 1 Outdoor unit to one room e g Using smaller model size but more Outdoor units e g Shorten the refrigerant piping as much as possible Note 1 In princi...

Страница 3: ...the base it may reach a flammable concentration in case the room is small To avoid ignition maintain a safe work environment by ensuring appropriate ventilation If the refrigerant leaks in a room or an area that has insufficient ventilation refrain from using flames until the work environment is improved by ensuring appropriate ventilation Do not install the outdoor unit in a basement or machinery...

Страница 4: ... m Height from the ground to an opening 0 125 m Width of an opening 0 9 m Longitudinal direction Example space with a louver A Amin M kg 10 20 30 40 50 60 112 223 334 445 556 667 Amin m2 Install the unit in a space with an installation area of Amin or more corresponding to the refrigerant amount M M factory charged refrigerant refrigerant to be added on site Secure sufficient installation space mi...

Страница 5: ...ed quantity of safety measures height of ceiling space 1 8 m 0 10 20 30 40 50 60 70 80 0 50 100 150 200 250 300 350 400 450 500 550 600 650 SyStem refrigerant amount kg NG ISO 5149 At least two safety measures are required At least one safety measure is required Construction guidance Room volume m3 Do not place an ignition source in a space where Hydro unit HBC is installed or adjacent spaces not ...

Страница 6: ...n equipment is NOT placed in the space where Hydro unit HBC is installed Hydro unit HBC is installed at the height of 1 8m or higher Hydro unit HBC is installed on the ceiling of a space except on the lowest basement floor Alarm required by applicable regulations is installed additionally START START Installation OK Installation OK 1 Machinery room installation Continuous ventilation Machinery roo...

Страница 7: ...ed additionally Small room installation Installation not allowed Installation not allowed Installation not allowed Installation not allowed Installation OK Installation OK 4 Small room installation Alarm Shut off valves NEXT PAGE NO NO NO Refrigerant concentration determination IEC GG 10 4 GG 10 5 ISO part1 A 5 2 2 A 5 2 3 Installation OK Installation OK 5 Installation on ceiling Alarm Ventilation...

Страница 8: ...the refrigerant concentration is less than 0 063 kg m3 when refrigerant leaks Hydro unit HBC is installed in the space where the refrigerant concentration is less than 0 16 kg m3 when refrigerant leaks Hydro unit HBC is installed in the space where the refrigerant concentration is less than 0 16 kg m3 when refrigerant leaks Two safety measures alarm and shut off valves required by applicable regul...

Страница 9: ...ionally 12 Ceiling space installation Circulation Alarm Ventilation NO NO 15 Small room installation Circulation Mechanical ventilation Mechanical ventilation requirement IEC GG 11 3 ISO part3 6 3 3 NO YES YES YES Two safety measures alarm and ventilation required by applicable regulations are installed additionally Two safety measures shut off valves and ventilation required by applicable regulat...

Страница 10: ...m Unoccupied space not designated a machinery room Unoccupied space not designated a machinery room 3 Small room installation Alarm 2 Small room installation No safety measures 4 Small room installation Alarm Shut off valves 5 Installation on ceiling Alarm Ventilation Height 1 8m Height 1 8m Height 1 8m Height 1 8m Height 1 8m Height 1 8m Leak detector alarm Leak detector alarm Alarm Hospital etc ...

Страница 11: ...rculation 10 Small room installation Circulation Alarm 11 Small room installation Circulation Alarm Shut off valves Unoccupied space not designated a machinery room Unoccupied space not designated a machinery room Unoccupied space not designated a machinery room Alarm Hospital etc Alarm Hospital etc Alarm Hospital etc Unoccupied space not designated a machinery room 8 Small room installation Mecha...

Страница 12: ...rm Supervised location Supervised location Supervised location Alarm Hospital etc Alarm Hospital etc Alarm Hospital etc Concentration check Concentration check Concentration check Concentration check Height 1 8m Height 1 8m Height 1 8m Height 1 8m Height 1 8m Height 1 8m 14 Small room installation Circulation Shut off valves 15 Small room installation Circulation Mechanical ventilation 12 Ceiling ...

Страница 13: ... 6 4 1 5 Safety shut off valve shall shut off the refrigerant under the control of refrigerant leakage detector ISO 1 A 5 2 1 ISO 3 6 4 1 6 The air conditioner and safety shut off valve shall use different electrical power supply ISO 3 7 2 1 Mechanical ventilation shall be operated continuously or be switched on by the refrigerant detection system IEC GG 11 3 4 ISO 3 6 3 3 3 2 During the continuou...

Страница 14: ...te they shall be tested to verify they still sense refrigerant at 25 of LFL or lower 6 The sensor shall include a means for self testing and the test shall be run at least every hour and if a failure is detected an alarm shall be activated IEC LL 7 7 If the sensor has a defined life and requires replacement after a given period the detection system shall initiate an alarm or indication that replac...

Отзывы: