MEES18K085
SAFET
Y
HANDL
ING FOR R3
2
9
3. Installation flow chart
SAFETY HANDLING FOR R32
Installation OK
Installation OK
Installation OK
Installation OK
Installation OK
Installation OK
Installation
not allowed
Installation
not allowed
Installation
not allowed
Installation
not allowed
Mechanical
ventilation system required by
applicable regulations is installed
additionally.
(12) Ceiling space installation
(CircAlarm+
Ventilation)
NO
NO
(15) Small room installation
(CircMechanical
ventilation)
<Mechanical
ventilation
requirement>
IEC/GG.11.3
ISO/part3-6.3.3
NO
YES
YES
YES
Two safety
measures: alarm
and ventilation required by
applicable regulations, are
installed additionally.
Two safety
measures: shut-off
valves and ventilation required
by applicable regulations, are
installed additionally.
Small room
installation
(13) Small room installation
(CircShut-off
Ventilation)
0000005090.BOOK 9 ページ 2018年12月27日 木曜日 午前10時3分