MEES18K085
SAFET
Y
HANDL
ING FOR R3
2
7
3. Installation flow chart
SAFETY HANDLING FOR R32
Hydro
unit/HBC is
installed in the space where
the refrigerant concentration is
less than 0.16 (kg/m
3
)
when refrigerant
leaks.
Two safety
measures: alarm
and shut-off valves required
by applicable regulations, are
installed additionally.
Two safety
measures: alarm
and ventilation required by
applicable regulations, are
installed additionally.
Two safety
measures: shut-off
valves and ventilation required
by applicable regulations, are
installed additionally.
Shut-off valves
required by applicable
regulations are installed
additionally.
Mechanical
ventilation required by
applicable regulations is installed
additionally.
Small room
installation
Installation
not allowed
Installation
not allowed
Installation
not allowed
Installation
not allowed
Installation OK
Installation OK
(4) Small room
installation
(Alarm+Shut-off valves)
NEXT PAGE
NO
NO
NO
<Refrigerant concentration
determination>
IEC/GG.10.4/GG.10.5
ISO/part1-A.5.2.2/A.5.2.3
Installation OK
Installation OK
(5) Installation on
ceiling
(Alarm+Ventilation)
NO
Installation OK
Installation OK
(6) Small room
installation
(Shut-off Ventilation)
NO
Installation
not allowed
Installation
not allowed
NO
Installation OK
Installation OK
(7) Small room
installation
(Shut-off valves)
<Shut-off valve
requirement>
IEC/GG.12
ISO/part3-6.4
Installation OK
Installation OK
(8) Small room
installation
(Mechanical ventilation)
<Mechanical
ventilation
requirement>
IEC/GG.11.3
ISO/part3-6.3.3
YES
YES
YES
YES
YES
YES
0000005090.BOOK 7 ページ 2018年12月27日 木曜日 午前10時3分