11
ENGLISH
No.
1
2
3
Reference drawing
Fig-1
Fig-2 (Note *2)
Fig-2
Fig-3 (Note *3)
Fig-3 (Note *4)
Detail of work
“IN” and “OUT” are marked on the
inside of the flare insulation. Mount the
portion marked “IN” near the unit body
and the portion marked “OUT” on the
field piping side.
• Fasten the insulated pipe with the
insulation tape.
• Firmly secure the insulation with the
provided tie band (4) at the position
indicated on the drawing.
• Fasten the flare insulation with the
provided tape (3).
• Fasten with the provided tie band (4)
at the position indicated on the
drawing.
Item to be observed
• Using the flare insulation of a different type
may result in condensation forming. Check
the type name on the insulation and be sure
to use the correct one.
• To prevent a gap from forming near the
unit’s side plate, be sure that the flare
insulation firmly contacts the unit’s side
plate before mounting.
• Incorrectly mounting the “INNER” and
“OUTER” sides of the insulation may result
in condensation forming.
Seal the slit securely so that there are no
openings. Be sure to mount the insulation so
that the slit is on the top.
Seal the slit securely so that there are no
openings. Be sure to mount the insulation so
that the slit is on the top.
Notes:
*1
Insert the flare nut into the field refrigerant piping. Pull the insulation material back at the area where it will be flared, then return
it to its original position after performing the flare work.
Exposing copper piping may result in condensation forming. Be extremely careful when performing this operation.
*2
There must be no gap.
*3, *4 There must be no gap. Slit should be on the top.
Work procedures
Mount the provided
pipe insulation (1) on
the liquid pipe of the
refrigerant piping, and
then mount the flare
insulation (2) on the
gas pipe.
Fixing of insulated pipe
Fixing of flare insulation
*2
7.3. Request for refrigerant piping connection
Description of parts to be used
*1
20
20
20
20
*3
*4
Fig-1
Fig-2 (figure showing the flare insulation)
Fig-3
“gas” mark
“IN” mark
“OUT” mark
Flare insulation (2)
Refrigerant piping (gas)
Refrigerant piping (liquid)
Field refrigerant piping
Pipe insulation (1)
Insulation material
Flare
Pull in this
direction.
Insulation material
Flare
There must be no gap.
Move to the
original position.
Field refrigerant piping
INNER
There must be no gap.
Unit body plate
OUTER
Unit body
Provided flare insulation
Tape (3)
Fasten with tape.
Provided tie band
Содержание Fresh Master GUF-100RD3
Страница 22: ...22 ENGLISH ...