10
Model
Tube Length
PVFY-P12, 18, 24
4.9 in. (125 mm)
PVFY-P30, 36
6.9 in. (175 mm)
PVFY-P48, 54
*8.9 in. (225 mm)
*Tube length provided.
Reinstall the coil assembly along with bracket(s) that secure(s)
it. Failure to reinstall the brackets will result in capacity loss and
condensation formation inside the cabinet. The wiring harness
for the LEV needs to be rerouted back into the electrical cabinet
and plugged into the
CN60
connector on the control board. The
wiring harness for the thermistor connector will also reroute into
the electrical section and plug into
CN44
. Refer to 9.3. Step 1 to
4 in reverse order to reassemble the panels. Ensure the proper
knockouts are removed for drainage and electrical connections.
NOTE:
For Horizontal installation an auxiliary drain pan must be
installed.
DETAIL A
PA79D202H01
11
proper knockouts are removed for drainage and electrical
connections.
NOTE:
For Horizontal installation an auxiliary drain pan must be
installed.
9.D. Downflow Installations:
Downflow installation requires
various changes to the air handler from its original configuration.
There are
NO
additional kits or parts required in order to convert the
Air Handler to the downflow configuration.
Step. 1
Please refer to 5.C. Steps 1-4 for removing the panels which
cover the Electrical, Coil Assembly, Blower and Filter.
Step.2
A. Remove the Control box cover.
B. Unplug the LEV (CN60) and Thermistor (CN44) from the control
board and route the harness from control box area out through the
rubber grommet.
C. Remove the brackets which secure the coil assembly if not
already done.
D. Slide the coil assembly out of the air handler cabinet.
Step. 3
Rotate the cabinet so the Fan assembly is on top
Auxiliary
drain pan
A
B
C
PRIMARY
DRAIN
3/4
”
FPT
Horizontal Right
Fan assembly rotation
not required
AIRFLOW
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
18
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
5/8”
(15mm)
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
DETAIL B
PLASTIC TIE
PLASTIC TUBE
PLASTIC TIE
PLASTIC TUBE
CORRECT
INCORRECT
DETAIL B
DETAIL A
9.2. Horizontal right installations
Refer to section 9.3. Step 1 to 4 & 12 for removing the entire coil
assembly from the air handler cabinet. This will require removing
the Filter, Blower, Electrical and Coil Panels along with the brackets
that secure the coil assembly. Be sure to also route the thermistor
and LEV wires out of the electrical portion of the air handler so the
coil can be removed.
Once the coil is removed, the two clear plastic tubes included in
the accessory bag will need to be attached to the top drain pan.
First, remove the lower rubber plugs in the top drain pan. Next,
install the clear plastic tubes which are included in the accessory
bag. Ensure the plastic tubes drain into the pan. Also, be sure the
clear plastic tubes do not have any restriction. Cutting of the plastic
tube is required, please refer to the table for length. Finally, secure
the clear plastic tubes to the top drain pan per Detail A. Then to
the metal brackets supporting the coil to the top drain pan with the
provided plastic ties as shown.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
2
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
2
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
0.200
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
RUBBER PLUGS
SECURE WITH
PLASTIC TIES
2 PER SIDE
2 PLASTIC TUBES
ENSURE TUBES
DRAIN INTO PAN
SEE
DETAIL A
Содержание CITY MULTI PVFY-P12
Страница 3: ...3 1 Dimensions ...