9. Additional refrigerant charge

At the time of shipping, the heat source unit is charged with the refrigerant.  As this
charge does not include the amount needed for extended piping, additional charg-
ing for each refrigerant line will be required on site.  In order that future servicing
may be properly provided, always keep a record of the size and length of each
refrigerant line and the amount of additional charge by writing it in the space pro-
vided on the heat source unit.

9.1. Calculation of additional refrigerant

charge

Calculate the amount of additional charge based on the length of the piping
extension and the size of the refrigerant line.

Use the table to the below as a guide to calculating the amount of additional
charging and charge the system accordingly.

If the calculation results in a fraction of less than 0.1 kg [4 oz], round up to the
next 0.1 kg [4 oz].  For example, if the result of the calculation was 8.48 kg
[277.4 oz], round the result up to 8.5 kg [280 oz].

<Additional Charge>

Flare machining dimension for systems using R410A is larger than that for
systems using other types of refrigerant in order to increase the air tightness.

Refer to the table on the below for flare machining dimensions, and follow the
regulations set forth by the local authorities. Seal off the opening of the pipe
with a closure material (not supplied) to keep small animals from entering the
pipe if that is a concern.

flare machining dimension (mm)

[Fig. 9.2.2] (P.3)

<A> [Ball valve (Gas side/flanged type)]

<B> [Ball valve (Liquid side/flared type)]

<C> This figure shows the valve in the fully open state.

A

Valve stem
[Fully closed at the factory, when connecting the piping, when evacuating, and
when charging additional refrigerant. Open fully after the operations above are
completed.]

B

Stopper pin [Prevents the valve stem from turning 90

°

 or more.]

C

Packing (Accessory)
[Manufacturer: Nichiasu corporation]
[Type: T/#1991-NF]

D

Connecting pipe (Accessory)
[Use packing and securely install this pipe to the valve flange so that gas leakage
will not occur. (Tightening torque:40 N·m [400kg·cm]) Coat both surfaces of the
packing with refrigerating machine oil. (Ester oil, ether oil or alkylbenzene [small
amount])]

E

Open (Operate slowly)

F

Cap, copper packing
[Remove the cap and operate the valve stem. Always reinstall the cap after op-
eration is completed. (Valve stem cap tightening torque: 23 ~ 27 N·m [230 ~ 270
kg·cm])]

G

Service port
[Use this port to evacuate the refrigerant piping and add an additional charge at
the site.
Open and close the port using a double-ended wrench.
Always reinstall the cap after operation is completed. (Service port cap tightening
torque: 12 ~ 15 N·m [120 ~ 150 kg·cm)]

H

Flare nut
[Tightening torque: Refer to the following table.
Loosen and tighten this nut using a double-ended wrench.
Coat the flare contact surface with refrigerating machine oil (Ester oil, ether oil or
alkylbenzene [small amount])]

I

ø9.52 [3/8] (PQHY-P72)
ø9.52 [3/8] (PQHY-P96)

J

ø19.05 [3/4] (PQHY-P72)
ø22.2 [7/8] (PQHY-P96)

K

Field piping

Appropriate tightening torque by torque wrench:

Copper pipe external dia. (mm [in])

Tightening torque (N·m / kg·cm)

ø6.35 [1/4]

14 to 18 / 140 to 180

ø9.52 [3/8]

35 to 42 / 350 to 420

ø12.7 [1/2]

50 to 57.5 / 500 to 575

ø15.88 [5/8]

75 to 80 / 750 to 800

ø19.05 [3/4]

100 to 140 / 1000 to 1400

Tightening angle standard:

Pipe diameter (mm [in])

Tightening angle (

°

)

ø6.35 [1/4], ø9.52 [3/8]

60 to 90

ø12.7 [1/2], ø15.88 [5/8]

30 to 60

ø19.05 [3/4]

20 to 35

[Fig. 9.2.3] (P.3)

flare nut size (mm)

A

B

outer diameter

ø6.35

ø9.52

ø12.70

ø15.88

ø19.05

size in inches

1/4"

3/8"

1/2"

5/8"

3/4"

dimension A

R410A

9.1

13.2

16.6

19.7

24.0

outer diameter

ø6.35

ø9.52

ø12.70

ø15.88

ø19.05

size in inches

1/4"

3/8"

1/2"

5/8"

3/4"

dimension B

R410A

17.0

22.0

26.0

29.0

36.0

<Example>
Indoor 1: 24

A: ø9.52 [3/8] 40 m [131 ft] a: ø9.52 [3/8]

10 m [32 ft]

2: 36

B: ø9.52 [3/8] 10 m [32 ft]

b: ø9.52 [3/8]

5 m

[16 ft]

3: 15

C: ø9.52 [3/8] 15 m [49 ft]

c: ø6.35 [1/4]

10 m [32 ft]

4: 12

D: ø9.52 [3/8] 10 m [32 ft]

d: ø6.35 [1/4]

10 m [32 ft]

5: 24

e: ø9.52 [3/8]

10 m [32 ft]

The total length of each liquid line is as follows:
ø9.52 [3/8]: A + B + C + D + a + b + e = 40 [131] + 10 [32] + 15 [49] + 10 [32]

+ 10 [32] + 5 [16] + 10 [32]
= 100 m [292 ft]

ø6.35 [1/4]: c + d = 10 [32] + 10 [32] = 20 m [64 ft]
Therefore,
<Calculation example>
Additional refrigerant charge

= 100 [292] 

×

 0.06 [0.65] + 20 [64] 

×

 0.024 [0.26] + 2.0 [71] = 8.5 kg [280 oz]

Value of  

α

Total capacity of connecting indoor units

α

Models 31 to 60

1.5 kg [53 oz]

Models 61 to 126

2.0 kg [71 oz]

9.2. Precautions concerning piping connec-

tion and valve operation

Conduct piping connection and valve operation accurately.

Flange type side connecting pipe is assembled in factory before shipment.

1

For brazing to the connecting pipe with flange, remove the connecting pipe
with flange from the ball valve, and braze it outside of the unit.

2

During the time when removing the connecting pipe with flange, remove
the seal attached on the rear side of this sheet and paste it onto the flange
surface of the ball valve to prevent the entry of dust into the valve.

3

The refrigerant circuit is closed with a round, close-packed packing upon
shipment to prevent gas leak between flanges. As no operation can be
done under this state, be sure to replace the packing with the hollow pack-
ing attached at the piping connection.

4

At the mounting of the hollow packing, wipe off dust attached on the flange
sheet surface and the packing. Coat refrigerating machine oil (Ester oil,
ether oil or alkylbenzene [small amount]) onto both surfaces of the pack-
ing.

[Fig. 9.2.1] (P.3)

A

Close-packed packing

B

Hollow packing

After evacuation and refrigerant charge, ensure that the handle is fully open. If
operating with the valve closed, abnormal pressure will be imparted to the
high- or low-pressure side of the refrigerant circuit, giving damage to the com-
pressor, four-way valve, etc.

Determine the amount of additional refrigerant charge by using the formula,
and charge refrigerant additionally through the service port after completing
piping connection work.

After completing work, tighten the service port and cap securely not to gener-
ate gas leak.

At the
conditions
below:

=

+

+

α

Liquid pipe size
Total length of
ø6.35 [1/4]

(m) 

×

 0.024 (kg/m)

(in) 

×

 0.26 (oz/ft)

Liquid pipe size
Total length of
ø9.52 [3/8]

(m) 

×

 0.06 (kg/m)

(in) 

×

 0.65 (oz/ft)

Additional
refrigerant charge

                (kg) [oz]

Liquid pipe size
Total length of
ø12.7 [1/2]

(m) 

×

 0.12 (kg/m)

(in) 

×

 1.29 (oz/ft)

Содержание CITY MULTI PQHY-P72TGMU-A

Страница 1: ...r safe and correct use please read this installation manual thoroughly before installing the air conditioner unit MANUEL D INSTALLATION Veuillez lire le manuel d installation en entier avant d installer ce climatiseur pour éviter tout accident et vous assurer d une utilisation correcte For use with R410A ...

Страница 2: ...4 ø14 9 16 Anchoring hole C Top view A Piping space for side piping B Heat source unit C Service space front side D Top view D Anti vibration pad etc E Concrete base E Piping space for top piping F Piping space for side piping G Heat source unit H Front view A Water circulation pipe B Close valve C Close valve D Water outlet A Short circuit wire Connected before delivery from manufacturer B Pump i...

Страница 3: ...2 ø15 88 5 8 ø19 05 3 4 ø22 2 7 8 Ó 4 Branching header Downstream unit model total 200 CMY Y104 G 8 Branching header Downstream unit model total 400 CMY Y108 G Ô 10 Branching header Downstream unit model total 650 CMY Y1010 G Ï Downstream unit model total 72 73 400 Ì Branch kit model CMY Y102S G CMY Y102L G Fig 9 2 2 9 2 9 Fig 9 2 1 A B 1 3 A Ball valve Low press side flanged type B Ball valve Hig...

Страница 4: ... material C Lagging D Caulking material E Band F Waterproofing laye G Sleeve with edge H Lagging material I Mortar or other incombustible caulking J Incombustible heat insulation material A Power source B Transmission line C Ground screw D C C B B E F G H I J A LO HI LO HI B A K J L H M C D E N O F G I Fig 9 3 1 Fig 9 3 3 Fig 9 3 2 9 3 A A Nitrogen gas B To indoor unit C System analyzer D Lo knob ...

Страница 5: ... M1M2S TB5 07 IC M1M2S TB5 06 L 2 L1 MA MA MA OC M1M2 M1M2S TB7 TB3 52 OC c 1 c4 S System controller L3 L 6 L4 c 2 A B A B A B A B M1M2 c 2 c 1 c 1 c2 CN40 CN40 c 3 10 3 B A C 208 230 V B A 208 230 V E E D E E Fig 10 3 2 Fig 10 3 1 A Group 1 B Group 3 C Group 5 D Shielded wire E Sub remote controller Address A Change the jumper connec tor from CN41 to CN40 B SW2 1 ON C Keep the jumper connector on...

Страница 6: ...to be exceeded hazards due to lack of oxygen in the room could result When moving and reinstalling the air conditioner consult the dealer or an authorized technician If the air conditioner is installed improperly water leakage electric shock or fire may result After completing installation work make sure that refrigerant gas is not leaking If the refrigerant gas leaks and is exposed to a fan heate...

Страница 7: ... valve The vacuum pump oil may flow back into the refrigerant cycle and cause the refrigerator oil to deteriorate Do not use the following tools that are used with conventional refriger ants Gauge manifold charge hose gas leak detector reverse flow check valve refrigerant charge base refrigerant recovery equipment If the conventional refrigerant and refrigerator oil are mixed in the R410A the refr...

Страница 8: ... excess air Compressed water may form in the low temperature sections of heat source unit Use a drainage pipe connected to the drain valve at the base of the unit to drain the water There is a water vent plug in the center of the heat exchanger water inlet head at the middle of the unit Use this for maintenance etc In addition do not allow any of the unit s electrical parts such as the solenoid va...

Страница 9: ...erator oil will dete riorate Never use existing refrigerant piping The large amount of chlorine in conventional refrigerant and refrigerator oil in the existing piping will cause the new refrigerant to deteriorate Store the piping to be used during installation indoors and keep both ends of the piping sealed until just before brazing If dust dirt or water gets into the refrigerant cycle the oil wi...

Страница 10: ...orque by torque wrench Copper pipe external dia mm in Tightening torque N m kg cm ø6 35 1 4 14 to 18 140 to 180 ø9 52 3 8 35 to 42 350 to 420 ø12 7 1 2 50 to 57 5 500 to 575 ø15 88 5 8 75 to 80 750 to 800 ø19 05 3 4 100 to 140 1000 to 1400 Tightening angle standard Pipe diameter mm in Tightening angle ø6 35 1 4 ø9 52 3 8 60 to 90 ø12 7 1 2 ø15 88 5 8 30 to 60 ø19 05 3 4 20 to 35 Fig 9 2 3 P 3 flar...

Страница 11: ...ic refriger ant R410A gas leakage causes the composition to change and affects perform ance Therefore perform the airtightness test cautiously Caution Only use refrigerant R410A The use of other refrigerant such as R22 or R407C which contains chlorine will deteriorate the refrigerating machine oil or cause the compressor to malfunction 2 Evacuation Evacuate with the ball valve of the heat source u...

Страница 12: ...heat source units whose power supply connector CN41 has been replaced by CN40 the shield terminal S of terminal block TB7 of the central control system should also be connected to the ground screw Fix the wiring securely in place with the cable strap at the bottom of the termi nal block so that the external force if not applied to the terminal block External force applied to the terminal block may...

Страница 13: ...A Change the jumper connector from CN41 to CN40 B SW2 1 ON C Keep the jumper connector on CN41 A Group 1 B Group 4 C Group 5 D Shielded wire E Sub remote controller Address Wiring Method and Address Settings a Always use shielded wire when making connections between the heat source unit OC and the indoor unit IC as well for all OC OC and IC IC wiring intervals b Use feed wiring to connect terminal...

Страница 14: ...light rain water etc when proceeding with the wiring and connections 3 The wire size is the minimum value for metal conduit wiring The power cord size should be 1 rank thicker consideration of voltage drops Make sure the power supply voltage does not drop more than 10 4 Specific wiring requirements should adhere to the wiring regulations of the region 5 Power supply cords of parts of appliances fo...

Страница 15: ...rent utilisez le réfrigérant R410A spécifié sur l appareil Lorsqu un réfrigérant différent est mélangé au réfrigérant d origine il se peut que le cycle du réfrigérant ne fonctionne pas correctement et que l appareil soit endommagé Si le climatiseur est installé dans une pièce relativement petite certaines mesures doivent être prises pour éviter que la concentration de réfrigé rant ne dépasse le se...

Страница 16: ...nterventions techniques Si l appareil est raccordé au secteur sans fonctionner le chauffage du carter est toujours sous tension au niveau du compresseur 1 2 Précautions à prendre avec les dispo sitifs utilisant le réfrigérant R410A Précaution N utilisez pas les tuyaux de réfrigérant actuels Le vieux réfrigérant et l huile réfrigérante se trouvant dans les tuyaux con tiennent une large quantité de ...

Страница 17: ...e il est conseillé de monter une base anti vibrations sur le socle de support de l appareil Fig 6 1 2 P 2 D Coussinet anti vibrations etc E Socle en béton Avertissement Installez toujours l appareil dans un endroit pouvant supporter son poids Dans le cas contraire l appareil pourrait tomber et par conséquent bles ser quelqu un Effectuez les travaux nécessaires afin d assurer a protection de l appa...

Страница 18: ...iez que le niveau d oxygène dissous de l eau ne dépasse pas 1 mg r 2 Norme de qualité de l eau Référence Guideline of Water Quality for Refrigeration and Air Conditioning Equipment Directive relative à la qualité de l eau pour le matériel de réfrigération et de climatisation JRA GL02E 1994 3 Contacter un spécialiste du contrôle de la qualité des eaux pour en savoir plus sur les méthodes de contrôl...

Страница 19: ...els Jauge collectrice tuyau flexible de remplissage détecteur de fuites de gaz valve de contrôle base de remplissage de réfrigérant jauge à vide équipements de récupération de réfrigérant Il se peut que l huile réfrigérante se détériore à la suite du mélange d un réfrigérant traditionnel à l huile réfrigérante Il se peut que l huile se détériore si de l eau y est mélangée Le réfrigérant R410A ne c...

Страница 20: ...9 1 13 2 16 6 19 7 24 0 dimension de l évasement mm taille de l écrou évasé mm diamètre extérieur ø6 35 ø9 52 ø12 70 ø15 88 ø19 05 taille en pouces 1 4 3 8 1 2 5 8 3 4 dimension B R410A 17 0 22 0 26 0 29 0 36 0 Fig 9 2 2 P 3 A Soupape à bille Côté gaz raccordement à brides B Soupape à bille Côté liquide raccordement évasé C Cette figure montre la soupape complètement ouverte A Tige de la valve Ent...

Страница 21: ...istor ROBINAIR 14830A Utiliser également une jauge à vide pouvant atteindre 65 Pa abs 0 00943 psi 0 5 Torr maximum après cinq minutes d utilisation 3 Ajout du réfrigérant Etant donné que le réfrigérant utilisé dans cet appareil est nonazéotropique il doit être dans un état liquide lorsqu ajouté Par conséquent lorsque vous char gez l appareil de réfrigérant à l aide d un cylindre si celui ci n est ...

Страница 22: ...ls source de chaleur ou le câblage avec le système de contrôle centralisé au bloc de terminaux de le contrôle centralisé TB7 Lors de l utilisation de câblage blindé raccordez la terre blindée de la ligne de transmission de l appareil intérieur à la vis de terre et raccordez la terre blindée de la ligne située entre les appareils source de chaleur et la ligne de transmission du système de contrôle ...

Страница 23: ... M2 et à la borne S des câbles de transmission du bloc de l appareil intérieur IC c Raccorder les bornes 1 M1 et 2 M2 du bloc terminal des câbles de transmission de l appareil intérieur IC qui possède l adresse la plus récente au sein d un même groupe au bloc terminal de la commande à distance RC d Raccordez les bornes M1 M2 et la borne S du bloc de terminaux pour le contrôle centralisé TB7 sur l ...

Страница 24: ...jusqu à ce que la température des tuyaux atteigne 35 C 95 F il fonctionne lentement pendant les 2 minutes qui suivent puis il fonctionne selon le préréglage Commande de réglage de la chaleur Le système est en train d être mis en marche Utilisez de nouveau la télécommande lorsque HO ou PLEASE WAIT a dis paru de l affichage Lorsque l appareil s arrête après le mode de refroidissement il continue de ...

Страница 25: ......

Страница 26: ......

Страница 27: ......

Страница 28: ...HIYODA KU TOKYO 100 8310 JAPAN Please be sure to put the contact address telephone number on this manual before handing it to the customer This product is designed and intended for use in the residential commer cial and light industrial environment Printed in Japan ...

Отзывы: