18 (45)
Installation
Figure 10 DIP switches
3.6
USB
The full speed USB 2.0 connection is shown in Figure 4. Connect a computer to this port in
order to configure the controller.
3.7
Reset and Download Buttons
Press the
RESET
button to restart the controller.
The
DWNLD
button is used for loading firmware on to the controller.
Refer to the OpenBAS Programming Manual for information on upgrading controllers.
3.8
Battery
The battery is used only during power outages for real time clock and data retention. The
Mircom part number for the battery is BT-025.
Install the battery before mounting the controller.
Attention: Caution – The battery used in this device may present a risk of fire or
chemical burn if mistreated. Do no disassemble, heat above 60°C
(140°F), or incinerate. Replace battery with FDK Corporation ML2430
batteries only. Use of another battery may present a risk of fire or
explosion.
DIP switches
1 2 3 4 5 6 7 8
!
Содержание OpenBAS-HV-NX10 Series
Страница 2: ......
Страница 6: ...6 45 List of Tables...