
10
25 mm Minimum
Spill-over level
Hose Retaining Ring
Slide Bar and Clamp Bracket - New Installation
Mira Logic ev - Exposed Variable Shower Fittings
Read the section
“Installation Requirements”
first (Page 9).
The slide bar should be positioned to one side of the shower control at a convenient
height for all the family. It should be positioned so the handset discharges down the
centre line of the bath, or across the opening of the shower cubicle. The handset should
be directed away from the shower control.
Note!
Special consideration should be given to the fixing arrangements when installing
on to dry lined, stud partition, shower cubicle or laminated panel wall structures.
Installers may wish to obtain alternative proprietary cavity fixings, or choose other
options, however, these methods of fixing are beyond the scope of this guide.
Important!
If the Logic slide bar replaces an existing Mira slide bar follow the
instructions
"Slide Bar and Clamp Bracket - Replacing an Existing Mira Slide
Bar Installation"
on Page 12, otherwise follow the instructions
"Slide Bar and
Clamp Bracket - New Installation"
below.
Clamp Bracket
Clamp Bracket
Button
Button Recess
1.
Decide on a suitable location for the
slide bar avoiding buried cables and
pipes. The position of the shower
control and the shower fittings must
provide a minimum gap of 25 mm
between the spill-over level and the
handset. This is to prevent
backsiphonage. Alternatively the Mira
outlet
double check valve (DCV-H)
can be fitted. This is available as an
accessory.
Note!
To avoid damage during transit,
the clamp bracket button and clamp
bracket have been supplied
separately.
2.
Remove the warning label in the clamp
bracket button recess and fit the
clamp bracket button to the clamp
bracket as shown. The button will fit
only one way.
Installation