![Mira Extreme Thermostatic Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/mira/extreme-thermostatic/extreme-thermostatic_installation-and-user-manual_1804951019.webp)
19
Chamfer
Run the hot and cold water supply
pipes at 28 mm centres, ensuring
that the pipe ends project into the
Mira Extreme by 30 mm to allow
connection into the inlet manifold.
Caution! Do not
use stainless
steel piping for inlet pipework.
Caution!
If chrome-plated copper
pipework is used then all traces of
chrome plate must be removed
from the connecting surfaces. If
the chrome is not completely
removed then the inlet manifold
collet will fail to grip the supply
pipe and the pipes will be forced
out of the inlet manifold due to the
water supply pressure.
3.11.
Ensure that the end of the supply
pipework is cut squarely and
free
from burrs
which can damage the
inlet manifold seals.
Chamfer the end of the pipe to
assist insertion into the fitting and
prevent the ‘O’ seal tearing.
Warning!
Do not
insert fingers
into the push-fit connectors as
this can result in injury.
Caution! Thoroughly flush the
incoming hot and cold water
supply pipes to remove debris
before connecting the Mira
Extreme shower
.
3.12.
Push the supply pipework inside
the inlet manifold until resistance
is felt.
DO NOT FORCE!
Note!
PTFE tape or liquid jointing
is
not
required to assist
connection.
3.13.
The collet and ‘O’ seal will
automatically make a hydraulic
seal.
Содержание Extreme Thermostatic
Страница 7: ...7 Dimensions Section 4 All dimensions are nominal and in millimetres 310 95 117 80 66 28 20 210...
Страница 42: ...Notes...
Страница 43: ...Notes...