SMART IP ACCESS
7
Reduced airflow
Install the equipment in a rack in such a way that the amount of airflow required
for safe operation is not compromised. Leave a gap of at least 5cm/2” each side of
the Smart IP Access.
Mechanical loading
Mount the equipment in the rack in such a way that a hazardous condition is not
achieved due to uneven mechanical loading.
Circuit overloading
When connecting the equipment to the supply circuit, consider the effect that
overloading of circuits might have on over-current protection and supply wiring.
Reliable earthing of rack-mounted equipment should be maintained. Give attention
to supply connections other than direct connections to the branch circuit (e.g. use of
power strips).
6.2 Rack mounting the IP Access
Rack mount the Smart IP Access using the supplied Rack-mount kit. There are 2
possible positions on the side of the Smart IP Access to connect the bracket. Screw
the bracket to the Smart IP Access using 2 screws. See Figure 3. Screw the other
bracket section to the rack.
Figure 3 Rack mounting the Smart IP Access
7. Terminology
Below are some terms and their meanings used in this guide.
Term
Meaning
Target Server
The computers/servers that are accessed remotely via the Smart IP
Access.
Client computer
The PC running a remote Smart IP Access session
Remote Session
The process of accessing and controlling Target Servers connected
to Smart IP Access from a User station
MINIC
O
M
SMART
IP
ACCESS
Power
Remote
Reset
Local
Screw this section
to side of Smart IP
Access
Screw this section
to the rack
Содержание 0SU51068
Страница 39: ...USER GUIDE 38 201204206 933197_EN...