178
Operating Instructions Combics Complete Scales
Safety Informationen EX
Scale
---
CAIS / CAW / CAAP
Revision
03
Released by
Reviewed by
Written by
1/8/2021
1/8/2021
1/6/2021
Date
T. Hiller
T. Hiller
Name
Material
Title
Alteration
543604
Drawing number
Safety instructions
65954-750-16 (EN)
Sheet
4
R. Koch
of
4
Th
e c
op
yi
ng
, d
istr
ib
uti
on
a
nd
u
til
iza
tio
n o
f th
is d
oc
um
en
t a
s w
el
l a
s t
he
c
om
m
un
ica
tio
n o
f i
ts
c
on
te
nt
s
to
o
th
er
s w
ith
ou
t e
xp
re
ss
ed
a
uth
or
iza
tio
n i
s
pr
oh
ib
ite
d.
O
ffen
der
s w
ill b
e h
el
d l
iab
le f
or
th
e p
ay
m
en
t o
f d
am
ag
es
. Al
l r
ig
ht
s r
es
er
ved
in
th
e ev
en
t o
f t
heg
ra
nt
o
f a
p
at
en
t, u
til
ity
m
od
el
o
r o
rn
am
en
ta
l
de
sig
n r
eg
ist
rat
io
n.
A
ny
in
fo
rm
at
io
n in
th
is d
oc
um
en
t is
s
ub
je
ct
to
c
ha
ng
e w
ith
ou
t n
ot
ice
an
d d
oe
s n
ot
re
pr
es
en
t a
c
om
m
itm
en
t o
n t
he
p
ar
t o
f M
in
eb
ea
In
te
c u
nl
es
s le
gall
y p
re
sc
ib
ed
.
14.
During installation, take suitable steps to prevent stray electrical interference (e.g. due to magnetic fields).
Keep any voltage transients away from the equipment.
15.
The indicator (display unit of the complete equipment) should be installed so that there is only a low risk of
mechanical danger to the IP protection. The equipment’s IP protection is IP6x as per EN 60529 / IEC 60529.
The equipment is intended to be used in clean environments and must be handled carefully in accordance
with the IP protection.
16.
The power connection must be in accordance with the regulations applicable in the country of operation. A
correct power connection must be ensured. The power cord must be protected against damage and must be
properly connected to the supply voltage (100 – 240 VAC, ± 10%, 50-60 Hz) or to the 24 VDC (± 10%)
for option L8. The indicator / the complete equipment can be used in electrical circuits of up to 1500 A. Only
use the power cord in the potentially explosive atmosphere with a suitable and approved explosion-
protected plug.
17.
Avoid generating static electricity. Only use damp cloths to clean the equipment. This applies in particular
when using a dust cover. The operator assumes responsibility for preventing any risks caused by electrostatic
charging.
18.
If cables are connected subsequently, make sure that the connections are not corroded. The grounding
conductor of a power cord must be the same gauge as the current-carrying wires (N and L).
19.
All external cables (even cables between load cells and junction box) are only suitable for fixed installation
and must be laid fixed. Otherwise, use cable glands designed according to EN 60079-0 and rounded at an
angle of 75° minimum and a radius at least equal to one-quarter of the diameter of the cables, but without
exceeding 3 mm.
20.
Cables from third-party manufacturers (subject to the operator’s responsibility; test for suitability as per
Annex A of EN 60079-0). Follow the pin assignment. Pay attention to the wiring diagram. Remove
connections that are not required.
21.
Unused openings must be sealed using suitable cover caps (dummy plugs) in order to maintain the IP
protection. Do not remove while live.
22.
When using external equipment in zone 2 explosion-risk areas, observe the gas group and temperature
class. The outputs must include the Ex nA electrical circuits. For zone 22, observe the maximum surface
temperature and group.
23.
Chemicals that can attack housing gaskets and cable sheathings must be kept away from the equipment.
These include oil, grease, benzine, acetone, and ozone. If you are uncertain, contact the manufacturer.
24.
The installation must be checked for correct function and safety by a trained and qualified person at
appropriate intervals.
25.
If the installation does not operate properly, disconnect it from the supply voltage immediately and secure it
against further use.
26.
In the event of repair, only use original spare parts supplied by the manufacturer.
27.
Any modifications to the equipment (except by persons authorized by Minebea) cause loss of conformity for
use in zone 2 and zone 22 explosion-risk areas and invalidate all guarantee claims. Similarly, the equipment
may only be opened by qualified and authorized personnel.
28.
Modifications (including by Minebea personnel) are subject to written approval.
29.
These instructions are given in addition to those in the instruction manuals and do not release the operator
from their responsibilities for the installation, operation, and inspection of the equipment assembly in
compliance with the provisions valid in the country of use.
Содержание CAW3P
Страница 125: ...Operating Instructions Combics Complete Scales 125 Specifications CAS G FE ...
Страница 126: ...126 Operating Instructions Combics Complete Scales Specifications ...
Страница 127: ...Operating Instructions Combics Complete Scales 127 Specifications CAS G IG ...
Страница 128: ...128 Operating Instructions Combics Complete Scales Specifications ...
Страница 134: ...34 Operating Instructions Combics Complete Scales Specifications ...
Страница 138: ...138 Operating Instructions Combics Complete Scales Declarations of Conformity ...
Страница 139: ...Operating Instructions Combics Complete Scales 139 Declarations of Conformity ...
Страница 140: ...40 Operating Instructions Combics Complete Scales Declarations of Conformity 1 5 ...
Страница 143: ...Operating Instructions Combics Complete Scales 143 EU type examination certificate ...
Страница 144: ...144 Operating Instructions Combics Complete Scales EU type examination certificate ...
Страница 145: ...Operating Instructions Combics Complete Scales 145 Test Certificate ...
Страница 146: ...146 Operating Instructions Combics Complete Scales 146 Evaluation Certificate ...
Страница 147: ...Operating Instructions Combics Complete Scales 147 14 Evaluation Certificate ...
Страница 148: ...148 Operating Instructions Combics Complete Scales Evaluation Certificate ...
Страница 149: ... Operating Instructions Combics Complete Scales 149 Certificate ...
Страница 153: ...Operating Instructions Combics Complete Scales 153 ...
Страница 154: ...154 Operating Instructions Combics Complete Scales Plates and Markings ...
Страница 155: ...Operating Instructions Combics Complete Scales 155 Plates and Markings ...
Страница 156: ...156 Operating Instructions Combics Complete Scales Plates and Markings ...
Страница 168: ...168 Operating Instructions Combics Complete Scales Plates and Markings ...
Страница 169: ...Operating Instructions Combics Complete Scales 169 Plates and Markings ...
Страница 170: ...170 Operating Instructions Combics Complete Scales Plates and Markings ...
Страница 171: ...Operating Instructions Combics Complete Scales 171 Plates and Markings ...
Страница 172: ...172 Operating Instructions Combics Complete Scales ...
Страница 173: ...Operating Instructions Combics Complete Scales 173 Certificate ...
Страница 174: ...174 Operating Instructions Combics Complete Scales ...
Страница 180: ...180 Operating Instructions Combics Complete Scales Certificate US C ...
Страница 181: ...Operating Instructions Combics Complete Scales 181 Certificate US C ...
Страница 182: ...182 Operating Instructions Combics Complete Scales ...
Страница 184: ...184 Operating Instructions Combics Complete Scales ...
Страница 185: ...Operating Instructions Combics Complete Scales 185 ...
Страница 186: ...186 Operating Instructions Combics Complete Scales ...
Страница 187: ...Operating Instructions Combics Complete Scales 187 ...