3 - 3
3.3
Turning on the Equipment
Before turning on the equipment, perform the following inspections:
■
Check for mechanical damage on the equipment or other damage on the pads package.
■
Make sure the pads cable is properly connected and battery installed.
■
Check the expiration date of the pads on the pads package.
Open the AED lid, then the equipment automatically powers on.
3.4
Switching Voice Language
You can press the Language button until the desired language is selected. At most three voice languages can be
configured.
3.5
Turning off the Equipment
Before turning off the equipment, perform the following inspections:
1.
Confirm that the patient therapy is completed.
2.
Disconnect the electrode pads from the patient.
To turn off the equipment, close the AED lid.
WARNING
•
If the patient is not connected to the equipment, and no operation is found performed on the
equipment within 30 minutes, the equipment will automatically shut down.
Содержание BeneHeart C Series
Страница 2: ......
Страница 10: ...4 This page intentionally left blank ...
Страница 14: ...1 4 This page intentionally left blank ...
Страница 22: ...3 4 This page intentionally left blank ...
Страница 34: ...6 4 This page intentionally left blank ...
Страница 40: ...8 4 This page intentionally left blank ...
Страница 42: ...9 2 9 2 Miscellaneous Description Model PN Disposable battery LM34S002A 022 000411 00 ...
Страница 50: ...A 8 This page intentionally left blank ...
Страница 64: ...E 4 This page intentionally left blank ...
Страница 68: ...F 4 This page intentionally left blank ...
Страница 70: ...G 2 This page intentionally left blank ...
Страница 72: ...H 2 This page intentionally left blank ...
Страница 74: ......
Страница 75: ...I 1 I Declaration of Conformity ...
Страница 76: ...I 2 ...
Страница 77: ......
Страница 78: ...P N 046 012619 00 2 0 ...