24
12.
Switch off the communication hub by pressing the on/off switch (position O). The
Shutdown screen displays.
13.
Disconnect the communication hub pump connection cord from the pump power inlet.
14.
Proceed to the installation of the pump (see
Installing the Pump
NOTE
This procedure applies to isolator tables that are up to 7 mm thick. For thicker isolator
tables, an adaptation kit is required. Contact our sales representative for more
information.
1.
Verify that the pump functions properly, and verify that the pump head is in its closed
position (see
Verifying that the Pump Functions Properly
).
2.
Retrieve the top wedging system from the packaging materials and place it on a flat,
stable horizontal surface with the face in which the communication hub was located
against the surface.
3.
Turn the pump display to its transportation position (horizontal).
4.
Turn the pump up side down and place it on the top wedging system.