- 19 -
Installation
Overview
Purpose
This chapter explains how to install the System.
Contents
This chapter contains the following topics:
Topic See
Page
Alarms generated during installation
20
POD Unit, tubing and power cord
21
Installing the Q-Gard Pack
24
Rinsing the System
27
Installing a POD Pak
29
Registering UV Lamp timer
31
Calibrating the Flowrate
33
Summary list
The steps shown below outline the sequence and major actions of a System
installation. Please refer to this list throughout the installation.
Step Action
1
Put POD Arm onto POD Mast
2
Put Point Of Delivery onto POD Arm
3
Install feedwater tubing, termination plug and power cord
4
Power on the System, check date and time
5
Install, flush and rinse the Q-Gard Pack and the Quantum
Cartridge
6
Install and Register the POD Pak
7
Register the UV Lamp timer
8
Calibrate the Product Water flowrate