OM-260 545 Page 17
5-4.
Installing Extraction Arm Base Assembly
Tools Needed:
9/16 in.
!
Turn Off and disconnect in-
put power.
Stabilize fume extractor by
locking front wheels (casters).
1
Base Assembly
2
3/8 in. Screw
3
3/8 in. Flat Washer
Place base assembly on cart. Se-
cure base assembly with supplied
hardware. Tighten hardware to 3.0
ft lb (4.0 N
⋅
m).
260 882-A / 260 889-A / 260 983-A
2
3
1
Cart
After installing extraction arm on cart,
remove pin so arm moves freely.
Содержание FILTAIR XD-10
Страница 5: ......
Страница 33: ...OM 239 025 Page 28 SECTION 9 ELECTRICAL DIAGRAM 263 782 A Figure 9 1 Circuit Diagram...