OM-240 113 Page 46
SECTION 12
−
ENGINE PREPARATION
12-1. Connecting the Battery
805 444-A / 287 097-B
1/2 in
Tools Needed:
!
Route battery cables
away from hot, sharp, or
moving parts.
!
Connect negative (
−
)
cable last.
1
Battery Cable Strain
Relief
2
EnPak Engine Block
3
Starter
Route cables from vehicle bat-
tery through strain relief.
Connect positive (+) cable to
engine starter. Connect negat-
ive (
−
) cable to unit engine
block.
3
2
Battery Specification:
12 V, 650 CCA at 0
°
F
Battery Cable Specification:
1/0 AWG
1
1
Содержание EnPak Mechanic OM-240 113H
Страница 60: ...OM 240 113 Page 56 SECTION 16 DIAGRAMS Figure 16 1 EnPak Circuit Diagram...
Страница 61: ...OM 240 113 Page 57 241 852 F...
Страница 63: ...OM 240 113 Page 59 238 945 B1 Figure 16 3 Hydraulic Circuit Diagram Page 1 Models With Hydraulic Power Source...
Страница 66: ...OM 240 113 Page 62 242 500 C Figure 16 6 EnPak Truck Wiring Diagram...