OM-240 113 Page 45
11-4. Load Sense Line Bleeding (Closed Center Systems Only)
805 444-A
1
Load Sense Line Bleeding
Valve
For systems utilizing closed
−
center
valving and load sensing, the load
sense line must be bled of air near
the pump. This is accomplished us-
ing the push
−
activated valve on the
load sense line.
Remove the spout cap from the
valve. Attach a 3/16 in. (4.7 mm)
tube to the spout and drain to a suit-
able container. While the unit is run-
ning, operate a crane function with
pressure below 700 psi (4.8 MPa)
and simultaneously press the valve
in. Continue this until all air is re-
moved from the line. Release valve
and replace cap.
1
Top View
Содержание EnPak Mechanic OM-240 113H
Страница 60: ...OM 240 113 Page 56 SECTION 16 DIAGRAMS Figure 16 1 EnPak Circuit Diagram...
Страница 61: ...OM 240 113 Page 57 241 852 F...
Страница 63: ...OM 240 113 Page 59 238 945 B1 Figure 16 3 Hydraulic Circuit Diagram Page 1 Models With Hydraulic Power Source...
Страница 66: ...OM 240 113 Page 62 242 500 C Figure 16 6 EnPak Truck Wiring Diagram...